Search Permits
12,301 results · type: electrical
Electrical
Electrical
Electrical
Electrical
ELECTRICAL COMMERCIAL
PANEL UPGRADE SAME LOCATION
ELECTRICAL VEHICLE CHARGING STATION
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
“Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permi SES Panel Replacement Replace existing electrical service entrance section (SES) panel with new 200A SES panel in same location per SRP design. SRP Work Order T3728525.
New detached 384 SF Aluma-wood pergola w/ 8' high media wall with some electrical improvements per engineered plans. (swimming pool, & gas on separate permit).
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
• Installation and/or modification of electrical wiring, devices, lighting, and equipment as required by project plans and field conditions • Installation of branch circuits, home runs, and terminations • Installation of lighting fixtures, switches, dimmers, and receptacles • Electrical connections for mechanical equipment and specialty systems • Upgrades and modifications to existing electrical systems as required
T-pole.
Gunite pool wiring
Wire new in ground pool
Replacing the top half of the meter service
Install 200 amp main disconnect, replace 200 amp indoor panel
Repair damaged wiring. Replace outlets, switches, light fixtures and smoke detectors.
Repair damaged wiring Replace outlets, switches, light fixtures, and smoke detectors.
new riser and meter
Installation of a 150-amp transfer switch
A-1 Electrical Contractors, Inc. has been contracted to provide Electrical service to Suite 201 at 732 St. Peter Street.
Wiring of new apartment
Wiring of new apartment
Wiring of new apartment
Replace panel, and install proper grounding New panel (200amps), new breakers, new stem wire, new feeder wire, new hardware, add 100 amp breaker, secure 3 outlets in kitchen, replce wire for steamer
Disconnect and reconnect due to home elevation.
Electrical service permit for Apt 557 at 4420 Dauphine St.