Search Permits
12,301 results · type: electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
SOLAR PV WITH ESS
PANEL UPGRADE SAME LOCATION
ELECTRICAL VEHICLE CHARGING STATION
SOLAR PV WITH ESS
SOLAR PANELS-PHOTOVOLTAIC SYSTEM
METER RESET
PANEL UPGRADE SAME LOCATION
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
INSTALLATION OF A 50 AMP DEDICATED CIRCUIT BREAKER FOR A CHARGEPOINT HOME FLEX WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS. A CODE CASE HAS BEEN OPENED (COB26-00118) FOR UNAUTHORIZED CARPORT TO GARAGE CONVERSION. PERMIT NEVER ISSUED (PMT20-19625). THIS WILL NOT AFFECT FINAL INSPECTION OR COMPLETION OF EV CHARGER PROJECT.
New 200amp Electrical Service and 22kw Generac Generator.
Vacancy permit
New construction electrical per plan
EV circuit Installation
House Meter for 4-plex lights, power
Pelican Electrical is requesting a permit to install exit signs and exterior lighting to the property. Pelican will do all work per current code. Thank you.
Pelican Electric is requesting a permit to install a new 200A 3-phase meter enclosure and a new 200A 3 phase outdoor main breaker panel with 42 spaces. Pelican will put new equipment in same place where old equipment was. Provide whole house surge protection, grounding and bonding. Pelican will label new breakers and do all work to current NEC code.