Search Permits
12,109 results · type: mechanical
REPLACEMENT OF AC EQUIPMENT IN THE ROOF LEVEL. NEW AC UNITS TO BE RECONNECT TO EXISTING PIPING AND ELCTRIC. PROTECT ROOFING SYSTEM. ALL AS PER PLAN FILED HEREWITH , NO CHANGE IN USE EGRESS OR OCCUPANCY
Relocate kitchen exhaust. Reuse existing bathroom exhausts for new bathrooms and laundry as per plans. No change in use, egress or occupancy.
Addition and/or Alterations
Addition and/or Alterations
New Construction
Addition and/or Alterations
Addition and/or Alterations
New Construction
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Interior remodel of existing SFR. The garage was previously converted without a permit into habitable space we are proposing to change that area back into a garage back porch enclosure into master bedroom closet and sunroom. Replacing plumbing like for like throughout the house where repairs are needed.
Replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton 2 stage 16 Seer2 York condenser evaporator coil and gas furnace
New single family residence - 2 story 3 bed/2.5 bath 2335 sqft living with attached garage
Replacement of complete existing central heat and air system with or without duct work REPLACE EXISTING HVAC SYSTEM
New single family residence - 1 story 3 bed/ 2 bath 1841 sqft living with attached garage.
Replacement of complete existing central heat and air system with or without duct work
7 DAY - Interior remodel of existing office space - OVA
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System and Repair Or Rebuild Of The Supply Air Plenum
Galloway 3312 B Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 682.88 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit H101
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2 Ton Heat Pump System and Replace the return & supply Plenum
ePlan: Residential Expedited Review - New construction of a 2 story single family residence 4 bedroom 4.5 bathroom covered patio & uncovered wood deck attached 2-car garage.
Replacement of complete existing central heat and air system with or without duct work
Express: fire/vehicle damage non-structural exploratory demo