PermitDig

Search Permits

205,741 results

plumbing

8004 WEST GLEN ROAD, Norfolk
0KJun 8

electrical

204 EAST MCGINNIS CIRCLE, Norfolk
0KJun 8

mechanical

3416 ESSEX CIRCLE, Norfolk
0KJun 8

electrical

2629 BAPAUME AVENUE, Norfolk
0KJun 8

sign

3321 E PRINCESS ANNE ROAD, Norfolk
0KJun 8

electrical

730 ROSWELL AVENUE, Norfolk
0KJun 8

building

3413 VERDUN AVENUE, Norfolk
0KJun 8

mechanical

5403 ROLFE AVENUE, Norfolk
0KJun 8

electrical

413 SINCLAIR STREET, Norfolk
0KJun 8

plumbing

8110 TIDEWATER DRIVE, Norfolk
0KJun 8

electrical

422 SHIRLEY AVENUE, Norfolk
0KJun 8

mechanical

527 MASSACHUSETTS AVENUE, Norfolk
0KJun 8

electrical

5821 OSPREY WATCH LAIR, Norfolk
0KJun 8

INSTALL NEW WOOD TEMPORARY WOOD CONSTRUCTION FENCE AS PER DRAWINGS.

1172 HALSEY STREET, Brooklyn
10KJun 8

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.

501 7 AVENUE, Manhattan
5KJun 8

installation of construction fence to protect site

1651 FIRST AVENUE, Manhattan
15KJun 8

Facade Inspection via Industrial Rope Access as shown on plans

420 5 AVENUE, Manhattan
Jun 8

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

203 WEST 131 STREET, Manhattan
15KJun 8

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

203 WEST 131 STREET, Manhattan
8KJun 8

Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

41-09 149 PLACE, Queens
Jun 8

IRA for Facade restoration and Inspection as shown on plans

32 WEST 18 STREET, Manhattan
Jun 8

Replacement of air conditioning units. No change in use egress and occupancy.

128 PIERREPONT STREET, Brooklyn
100KJun 8

interior mechanical 11th floor

151 WEST 42 STREET, Manhattan
175KJun 8

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

500 WEST 120 STREET, Manhattan
1KJun 8

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

360 EAST 57 STREET, Manhattan
1KJun 8

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

2970 BROADWAY, Manhattan
1KJun 8

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

327 EAST 48 STREET, Manhattan
1KJun 8

INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.

575 MADISON AVENUE, Manhattan
1KJun 8

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

9 SPRING STREET, Manhattan
1KJun 8

INSTALLATION OF PLYWOOD FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

300 EAST 75 STREET, Manhattan
10KJun 8