PermitDig

Search Permits

18,986 results · type: plumbing

COMMERCIAL

803 MAGNOLIA AVE 131, Corona
Jun 24

Remodel - Bathroom Shower - 13 SF remodel to converting tub to shower, replacing pan, drain, and valves. Drain pipe to remain in place. Existing post tension slab.

4846 S CURIE WAY, Mesa
Jun 24

Converting tub to tub, replacing pan, drain, and valves.

944 S VALENCIA 5, Mesa
Jun 24

Installation of 90-ft of .75-in PE gas line buried 18-in with 18-gauge tracer wire from gas meter to 55K BTU BBQ. All gas lines are to be installed per 2024 IFGC & COM gas requirements. Contact COM gas engineering at 480-644-2909 to determine if the meter needs to be upgraded.

5835 E STAR VALLEY ST, Mesa
Jun 24

WATER METER RELOCATION MOVING 2 1/2 FT EAST

2123 N SUMMER ST, Mesa
Jun 24

Shower Remodel in Master Bathroom. No structural changes - will tie into existing piping. No change to overall square footage.

623 N FOREST, Mesa
Jun 24

plumbing

533 WASHINGTON PARK, Norfolk
0KJun 24

Installation of new gas piping rough-ins, new domestic water supply lines, and new waste and vent piping cellar through the 3rd floor.

1239 41 STREET, Brooklyn
5KJun 24

PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#X01386212-I1.

3123 CORLEAR AVENUE, Bronx
75KJun 24

1. EXISTING 2 FAMILY HOUSE WITH PLUMBING WORK AT GROUND, 1ST AND 2ND FLOOR . JOB FILED TO RELATED TO ALT2 APPLICATION# B01416842-I1.2. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THISAPPLICATION.

259A NASSAU AVENUE, Brooklyn
42KJun 24

PLUMBING RENOVATION (NEW AND RELOCATED BATHROOMS), NEW DISHWASHER AND WASHER, NEW KITCHEN SINK. IN NEW APARTMENTS 2nd Floor (apt 201-A, 201-B and 201-C), 8th Floor, (apt 803-A and 803-B) 10 Floor (apt 1002-A and 1002-B), 11 Floor (apt 1102-A and 1102-B)

159 WEST 54 STREET, Manhattan
250KJun 24

Plumbing plans for existing residential building undergoing an alteration.

556 4 STREET, Brooklyn
75KJun 24

CAP& REMOVE EXISTING PLUMBING FIXTURES, INSTALL NEW PLUMBING FIXTURES AS PER PLANS FOR THIS (2) TWO FAMILY DWELLING UNITS FILED IN CONJUNCTION WITH ALT APPLICATION #B01413257-I1 NEW PLUMBING FIXTURES AS PER PLANS.

1172 HALSEY STREET, Brooklyn
87KJun 24

FILE PLUMBING WORK AT CELLAR OF EXISTING 3-FAMILY TO INSTALL BOILER AND HWH AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

2169 EAST 17 STREET, Brooklyn
18KJun 24

HEREBY FILING FOR THE INSTALLATION OF FIXTURES IN CONJUNCTION WITH TENANT FIT OUT. NO CHANGE TO USE OCCUPANCY OR EGRESS.Chipotle; space 0176

5100 KINGS PLAZA, Brooklyn
70KJun 24

INSTALL (2) REPLACEMENT HOT WATER HEATERS, (2) STORAGE TANKS AND CONNECT TO EXISTING GAS PIPING AND VENTING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

515 WEST 23 STREET, Manhattan
128KJun 24

PLUMBING WORK IN CONNECTION WITH INTERIOR RENOVATION OF THREE DWELLING UNITS. RELOCATE KITCHENS, INSTALL NEW BATHROOMs as per submitted plans.

45 HEMLOCK STREET, Brooklyn
26KJun 24

Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.

1 LIBERTY PLAZA, Manhattan
50KJun 24

CONNECT EXISTING GAS PIPING TO REPLACEMENT GAS BOILER AND HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.

52 DIAMOND STREET, Brooklyn
2KJun 24

COMBINATION OF APTS FILED IN CONJUNCTION WITH DDB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

45 WEST 10 STREET, Manhattan
32KJun 24

APPLICATION FILED HEREWITH TO REMOVE EXISTING STALL SHOWER IN BASEMENT.

37 ACACIA AVENUE, Staten Island
3KJun 24

FILING PLUMBING WORK TYPE TO CONVERT FROM OIL TO GAS FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

1841 WEST 8 STREET, Brooklyn
9KJun 24

HEREWITH FILIG FOR PLUMBING WORK AT APT# 9 & 10 IN AN EXISTING 6 STORYBUILDING W/BASEMENT.

119 ELIZABETH STREET, Manhattan
9KJun 24

HEREWITH FILE PLANS TO RENOVATE APT. 10F, REPLACE, RELOCATE AND NEW PLUMBING FIXTURES. (TOTAL SF OF THE AREAS OF WORK IS 120 SF)

1088 PARK AVENUE, Manhattan
39KJun 24

Plumbing work for landlord rennovation at this locaiton. No change in use, egress, or occupancy under this application.

535 5 AVENUE, Manhattan
55KJun 24

SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB - B01038023-S2

1628 EAST 24 STREET, Brooklyn
12KJun 24

Northwell Health LIJ Medical Center: Plumbing, Sprinkler and Standpipe installation in conjunction with the construction of new three-story Behavioral Health Pavilion (BHP 2) building on private hospital property.

264-25 76 AVENUE, Queens
Jun 24

RENOVATE EXISTING APARTMENT 9B MASTER & GUEST BATHROOMS: REPLACE 2 LAV'S., 2 TOILETS, 1 TUB. REMOVE 1 TUB AND NEW 1 SHOWER IN SAME LOCATION AS PER PLANS FILED.NO CHANGE IN USE, EGRESS OR OCCUPANCY.

500 WEST END AVENUE, Manhattan
21KJun 24

FILING APPLICATION FOR THE INTERIOR RENOVATION OF APT. 11L ON THE 11TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

150 EAST 69 STREET, Manhattan
16KJun 24

Plumbing work for landlord rennovation at this locaiton. No change in use, egress, or occupancy under this application.

535 5 AVENUE, Manhattan
35KJun 24