Search Permits
11,718 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Mary Sapp
Interior build-back and restoration of two fire-damaged apartment units. Replacement of drywall insulation finishes cabinetry flooring doors windows electrical plumbing and HVAC components as required. No change to building footprint or structural framing. Like-for-like. (2 Apps - Bldg. 4 - Units 4101 and 4204)
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [2bed 1bath] Work to include: First floor Interior remodel First Floor Addition new beds new baths [4bed 3bath].
EXPRESS: Rebuild a portion of the duplex that was burned approximately 10 percent
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work System change out with ductwork
Replacement of complete existing central heat and air system with or without duct work 2.5T Hvac Replacement
Interior remodel. Remodel/reconfigure previously converted garage space to create a closet and bathroom.
New 2-story single-family residence with 4 bedrooms 4 1/2 bathrooms attached 2-car garage covered entry porch and patio.
Replacement of complete existing central heat and air system with or without duct work 3t gas 2 stage replacement
1702AL NEW 1 STORY 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Replacement of complete existing central heat and air system with or without duct work
Replacement of mini-split system Install 1 ton daikin Mini split
Replacement of complete existing central heat and air system with or without duct work
Express - Remove and replace windows (same size) no structural changes. Remove and replace exterior siding and trim Revision-Bathroom 1 remodel: new tub diverter valve tile shower surround vanity Bathroom 2 remodel: new shower pan diverter valve tile shower surround vanity Kitchen remodel: remove and replace cabinets and countertops electrical work: remove and replace all electrical plug outlets and switches install new recessed light fixtures Revision 2 - Main electrical panel change only the
Remodel Hospital - 2nd Floor - Surgery - with associated above and below ceiling/floor work. (2) Applications
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
*Green Building* New 1-story 3 bedroom 3 bathroom single family residence with attached garages covered front porch and rear covered patio.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Remodel Hospital - 2nd Floor - PACU - with associated above and below ceiling/floor work (2) Applications
Replacement of complete existing central heat and air system with or without duct work in the main office
New 2 Story SFR with attached carport and covered porch and pool 5/4
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 5bath] with Habitable Attic Attached Garage
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work UNT B 4309 AIRPORT CONDOMINIUMS