Search Permits
16,779 results · type: electrical
PERMIT IS ONLY FOR THE INSTALLATION OF THREE ENPHASE IQ 10C BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
Extension of existing circuit from house to pergola to control lighting and fan. No special inspections. Minimum required building inspections: Electric rough in and electric final.
PERMIT IS ONLY FOR THE INSTALLATION OF TWO SIGEN 9.0 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
Installation of 22kw generator, sub panel, transfer switch, and dedicated gas line to existing SFR. Minimum required building inspections: Electric rough in and electric final, Gas rough in and gas pipe final, and final.
Install new battery system, 13.5kWH. 200A Main panel upgrade.
electrical
electrical
electrical
electrical
electrical
Rebuild of an overhead residential service whose SE cable and point of attachment have been damaged. We will install a new mast point of attachment 200A meter socket 200A MCB main panel new ground rods inter system bonding device whole house surge suppressor and new branch circuit breakers.
TEMP POWER
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 3.5bath] with Attached Garage. Bldg 3
Interior remodel to existing restaurant with dining room addition.
ETJ-NEW SFR (AE)
ETJ- New construction sfr
ePlan: Residential Expedited Review - New Autofill/Heated pool.
ETJ New construction multi-family 12meters + HP+Pool
BASE: Installing a backup battery system and additional meter socket.
Tie condenser into existing dedicated 120V circuit; disconnect in sight of unit per nameplate (20A max MCA 17A).
ETJ-New construction sfr
Home builders loop Ref: 2025-008360 EP reference permit 2025-044440 BP
EV charger installation
Replace 125A Federal Pacific house panel with a Eaton 125A main breaker panel
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 3.5bath] with Attached Carport. Bldg 2
Homebuilder loop.
*PARTIAL DEMO* ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [5bed 3bath] Work to include: First floor Interior remodel Relocate stairs Second Floor Interior remodel Demo Existing balcony Convert portion of garage for powder [4bed 3.5bath] New Office No increase in bldg cover or impervious cover.
Emergency disconnect re connect melted wires and blocks