Search Permits
205,070 results
Convert existing rear patio to livable - game room
The apartment complex has 13 buildings with 36 units total. . New water, landscape and electrical meters. Includes a pool and ramada, new drive, parking and retention area. Deferred fire sprinklers and electric vehicle gates.
Remove manual price number and reface with LED pricer cabinet. No modifications to existing cabinet or monument sign.
CONVERT EXISTING ONE CAR CARPORT INTO A GARAGE. ADD GARAGE DOOR TO WEST ELEVATION AND ADD WALL AND WINDOW ON SOUTH ELEVATION. ALL WORK TO BE DONE UNDER EXISTING ROOF.
New 2309 SF single story residence with a 2+ car garage at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs **SEE ADDENDA MST25-07605**
CONSTRUCT A 402 SF SWIMMING POOL & 64 SF SPA. NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST19-00383. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS
NEW 1970 SF SINGLE STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. ADDENDA MST22-18751 - PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION: · REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F.
Replace existing tub/shower with acrylic base and walls. Replace fixture and valve. Only working in wet space. No electrical work. 2 bathrooms - Master and secondary. No change to overall square footage of home.
Remodel with addition – Remodels 216 S.F. of non-livable patio to livable – 24 S.F. of non-livable carport to livable – 80 S.F. of non-livable storage to livable – 227.5 of non-livable carport to garage. Additions 217 S.F. livable – 254.5 non-livable. Type V construction. R-5 occupancy
IRC 2018 BLANDFORD HOMES #3177. Single Family Residence (SFR), single story facility with post tension slab, pre-engineered trusses, wood frame construction, tile roof, and stucco exterior finish. See MST21-05194 for structural design for Monteluna. SEE MST21-12329 FOR THE RESERVE AT RED ROCK STRUCTURAL CHANGES. SEE MST22-06882 FOR STRUCTURAL CHANGES AT THE GROVE AT LEHI. ADDENDA MST25-06778 GROVE AT LEHI ONLY - CHANGE FROM NATURAL GAS TO PROPANE ON THE PLUMBING SHEET FOR STOVE TOP.
Install three (3) Neon illuminated pan channel letter sets on raceway/canopy on North, East and South Elevations THE VIG 13 sq. ft. each (39 sq. ft. total)
New development of a 118,302 SF, 161 unit, 6-story mix-use building comprising of 5-story type III-B construction apartment units above a 1-story type I-A construction parking garage with commercial space. Special inspections req. - Steel, concrete, wood, soils. Mastic and intumescent fire-resistant coatings, fire-resistant penetration & joints and Electrical equipment rated at or above 1,000 amps. Special inspection for Emergency Responder Radio Coverage. Deferred fire sprinklers, fire alarm, a
Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
Group B Occupancy. Type V-B Construction. 3,500 SF. Occupant load 37. Existing grey shell building. New partition walls to create offices, exam rooms, break room, 2 ADA compliant restrooms, and lobby. New mechanical ducting, diffusers , return air grills, and smoke detectors for 3 - existing heat pumps on the roof. New water supply lines, associated plumbing equipment, and waste lines. New dental vacuum system with amalgam separator. New 400A 3 phase electrical meter. New architectural and MEP
Install one non illuminated entry sign THE MASON 18.90 Sq ft on existing entry wall..
New 243 SF non livable patio addition extending the existing attached patio. Type V construction. R5 occupancy. No utility update. No deferred items. No special inspections.
Removed and replace electrical equipment with new at existing cell tower site. Results in CoC.
TI in an existing 533,835 SF construction type III-B warehouse building. Scope includes installation of the electrical controls, equipment, material handling, and sorting system. Special inspection for post-installed anchors and electrical. Results in CoC.
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
Installation of one set of illuminated pan channel letters 25 sq ft THE MASON with flower inside the letter O. Sign to be installed on building 14 north front entrance cantilever. Signs shall be installed per NEC 2023 with UL listed components
CONSTRUCT A 344 SF SWIMMING POOL NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
Back addition to home (west), 2nd bathroom addon, new windows, pavers, new roof, new stucco (termite damage), new HVAC system. Addition of 85 S.F. livable. Relocate new 200A panel box on north side of new extension. Truss calculations deferred. Approved as noted: Finish elevations to be consistent with approved ADM25-00154. Doors shall match approved ADM25-00154 elevation or be of a similar design to comply with historic guidelines.
Install temporary power and tent for temporary new lunch tent.
Excavate for upgrade gas line from street to house from 0.5-inch diameter to 1-inch diameter. Also upgrade meter to 2M BTU.
New 720 SF livable accessory dwelling unit including two bedrooms, three bathrooms, laundry, kitchen, and living room. Type V construction. R5 occupancy. No upgrade to utilities. Deferred truss calculations. No special inspections.
Existing SFR 2 bedroom, 2 bath with a den. Another option for this home was a 3 bedroom, 2 bath. Scope of work is to add a 28-inch door to the den and enclosed in the space that was already present for a closet by adding a 30-inch door. This makes the home have 3 bedrooms and 2 baths. No electrical, mechanical or plumbing changes. No change to overall square footage at existing SFR.
INSTALLATION OF A NEW MANUAL FIRE ALARM SYSTEM INTO A NON-SPRINKLER FLIGHT HANGAR REMODEL. THE HANGAR WILL BE PHASE 2 UNDER A SEPARATE PERMIT.
We are replacing (1) 800-ton chiller and associated piping as required. All electrical and controls will be reconnected as needed.
INSTALL AN ELECTRIC WATER HEATER
Construction of new 2922 sq ft, 3 bed 2.5 bath single family home.