Search Permits
204,597 results
New 2-story dwelling unit 1 bed/1 bath
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 4 Bedrooms 3.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8002 PONCHO PASS 2025-070719 PR (INCLUDES 23 ADDRESSES.)
Complete service change. Like for like.
Interior remodel to existing office suite. Existing law office is taking over additional space from adjacent suite 270 which will be fully consumed by suite 250 accessing via a new cased doorway no new demising walls. No access control.
TEMP POWER
Express: Work to be done in both units (1 and 2) drywall replacement electrical outlets/switches/wires plumbing fixture repair
Install Sprinkler System - ETJ
Home builders loop Ref: 2026-050559 BP
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 3 Bedrooms 2.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8000 PONCHO PASS 2025-070709 (INCLUDES 22 ADDRESSES.)
Plumbing for New construction of SFR in the ETJ 1985 sq ft
Express: Foundation repair - install 17 push piers
New in-ground swimming pool w/ reqd enclosure device for existing two-unit residential use.
New Ground up facility of approximately 950 sq feet for general sales of coffee and pre-packaged items. 2024 058767 SP - Concurrent Review
The Collins - Main ID 2 - install halo-lit channel letters THE COLLINS east elevation
Express: Replacing 11 windows like for like
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Replacement of complete existing central heat and air system with or without duct work 2.5 Ton Horizontal Electric System
TEMP POWER
irrigation for lawn
New construction of single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
Installation of 1 dual port level 2 EV charger
A 6773 SF tenant finish out for an office not sprinkled with no site improvements.
200amp Service Upgrade
Construct new driveway approach of 26.2 FT. No sidewalk inspection per plan review.
Replacement of complete existing central heat and air system with or without duct work 3 ton 16 seer2 two stage condenser gas furnace and evaporator coil
Replacement of complete existing central heat and air system with or without duct work like for like change out
ePlan: Residential Expedited Review - Interior Remodel Only to Existing 1-Story Single Family Res. [4bed 4bath] 6/26/26 SM ** REVISED ** Kitchen peninsula being rebuilt Adding a fireplace where study was converting the gym to bedroom 4 and adding a wall to create a kitchenette New shower pan in bath 4 all new primary bath reduce bed 2 for primary closet cosmetic updates in bath 2 and 3. New lighting and conductors throughout the home add receptacles where required in areas in the scope.
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4200 ENDURANCE WAY
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 3 Bedrooms 2.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8000 PONCHO PASS 2025-070709 (INCLUDES 22 ADDRESSES.)
PB- New construction 4 bed 2.5 bath PUD