Search Permits
12,083 results · type: mechanical
INSTALLATION OF SPLIT SYSTEM ON THE 2ND FLOOR AND ROOF WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
FILING HEREWITH APPLICATION FOR MECHANICAL WORK. INSTALLATION OF NEW MINI SPLIT UNIT FOR JOE COFFEE COMPANY . NO CHANGE TO USE, EGRESS OR OCCUPANCY.
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
INSTALLATION OF NEW WATER SOURCE HEAT PUMP AIR HANDLERS & RELATED DUCTWORK AND PIPINGCONNECTED TO THE BUILDING SYSTEM AND INSTALLATION OF A NEW VENTLESS KITCHEN HOOD WITHIN THECOMMERCIAL KITCHEN AT THE 1ST FLOOR AS PER THE DRAWINGS FILED HEREIN.
INTERIOR RENOVATION OF EXISTING OFFICE SUITE INCLUDING NEW PARTITIONS, FINISHES, FURNITURE, AND MECHANICAL, ELECTRICAL, AND PLUMBING WORK TO ACCOMMODATE NEW LAYOUT.
Application filed to obtain a Certificate of Compliance - the proposed work solely involves replacing the outdoor condensers. Ventilation system, along with all the existing ducts and piping shall remain.
ASSOCIATED MH WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
MECHANICAL WORK ASSOCIATED WITH ALTERATION APPLICATION B00942658-I1
Filing to legalize HVAC units on the roof. Scope originally approved under #200822761, but never permitted.
Mechanical modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.
New Construction
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton vertical gas system (Unit B1)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Vertical Gas System (A-3)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Horizontal Gas System (Unit 701)
Express- [Fire Remediation] Fire damage to backyard deck partial exterior wall and smoke damage inside. Interior remodel due to smoke damage. No structural work. See structural verification report.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 ton horiz heat pump system (Apt F2)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 ton horizontal gas system
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 Ton Gas Horizontal System
Replacement of complete existing central heat and air system with or without duct work Downstairs System-Under House. 5 Ton Gas Infinity Green Speed