Search Permits
204,597 results
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 12k Carrier Mini Split System
Gas to be on test before inspector can pass our final for replacing existing water heater
ePlan: Expedited Review - First Time Finish Out for units.
CONSTRUCT NEW MULTIFAMILY COMPLEX - CARPORT
ePlan: Expedited Review - First Time Finish Out for Units.
65 tunnel below the foundation to replace entire drain system. 3 access holes - Right back left
Interior Remodel/Porch Enclosure: Remove some interior walls and replace headers/beams per structural. Remove and replace mechanical plumbing and electrical systems. Remove and replace walls and calling insulation. Remove and replace gypsum board. Remove and replace finishes plumbing fixtures mechanical equipment and appliances.
irrigation for lawn
ePlan: Expedited Review - First Time Finish Out for Lobby Mail Office Breakroom Restroom and Facility Manager.
Construction of in-ground swimming pool
ePlan: Expedited Review - New Shell Building of a 57-Story Mixed Use Multi-Family Bldg. with Parking Garage. Contains Lobby Offices Amenities Mail Breakroom Restrooms Dog Park Fitness and Co-Working (876109 SF).
Emergency repair requested by owner to re-install the feeder from the disconnect to the gutter box due to theft of wire the night before.
Autofill Pool for Bdg 1
Replacement of an existing water heater Replace 50-gallon natural gas water heater Located in garage closet
ePlan: Expedited Review - First Time Finish Out for Units.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Expedited Review - First Time Finish Out for Units.
Diagnostic revealed reoccurring sewer stoppages underneath foundation. Sewer system underneath foundation is original cast iron sewer piping and needs to be replaced. This is a complete sewer repipe. Sewer line in the yard is PVC and in good working condition. - Plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - Begin by excavating an entry hole on the left side of the home where the sewer line exits the foundation. - Th
Installation of (2) dual port level 3 DCFC EV Chargers - City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5 2026 032649 DA - Concurrent
New two-story SFR (4br/3ba) with attached garage covered porch and covered patio *PRODUCTION BUILDER- GREEN BUILDING*
EPLAN REVIEW: remodel Big Bend Auditorium - 1st Floor.
Replacement of an existing water heater Replace 50-gallon gas water heater Located in hallway closet
CONSTRUCT NEW MULTIFAMILY COMPLEX CARPORT
Replacement of complete existing central heat and air system with or without duct work
install sprinklers to turf and dripline to flowerbeds
Replacement of an existing water heater Replace 40-gallon gas water heater Located in garage
QT - Interior alteration of approx. 3497 sq ft of existing interior office space - OVA
2070CL NEW 2 STORY 3 BEDOOM 2 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [2bed 1bath] Work to include: Interior remodel First floor addition new bed new bath [3bed 2bath].
Replacement of complete existing central heat and air system with or without duct work