12,027 results · type: mechanical

Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.

9509 E PARMER LN, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work

11210 KINGSGATE DR, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work

3304 GRASSHOPPER DR, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work Install new 3-Ton Carrier Performance Series 16-SEER2 Two-Speed Electric AC & Gas Heating System

8109 ASHERTON CV, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC through Austin Energys Home Energy Savings program.

1000 BODGERS DR, AUSTIN
Jun 8

ePlan Review: Office Remodel 2nd Floor Suite 200

3900 N CAPITAL OF TEXAS HWY SB BLDG F UNIT 200, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work

9325 CASTLE PINES DR, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work 4ton 2stage Gas system replacement

9916 BUNDORAN DR, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton Heat Pump System

3202 BEANNA ST BLDG B, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork

6412 TAYLORCREST DR, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System and Repair Or Rebuild Of The Supply Air Plenum

11724 CHANNING DR, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work Benjamin Gomez

1907 HAMILTON AVE, AUSTIN
Jun 8

Bldg 2 New 2-story single family residence 2 bed/2.5 Bath with attached garage covered porch balcony and driveway

2503 S 4TH ST BLDG 2, AUSTIN
Jun 8

Caprock S405 B Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.

5100 SEA SALT DR, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work Replacement of four (4) CHW air handling units (units #11 and #12 on the 2nd floor and #17 and #18 on the 3rd floor)

8303 N MOPAC EXPY SVRD NB BLDG C, AUSTIN
Jun 8

ePlan Review: Office Remodel - 3rd Floor Suite 300

3900 N CAPITAL OF TEXAS HWY SB BLDG F UNIT 300, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work

8306 HORNET DR, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work Replacing inside air handler unit and outside condenser unit. Leaving all ductwork in tact.

1305 CHESTNUT AVE, AUSTIN
Jun 8

Addition and Remodel Addition and renovation of an existing one story SFR resulting into a two story 3 bedroom 405 bath

1611 PRESTON AVE, AUSTIN
Jun 8

Bevolution Project Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.

6414 ED BLUESTEIN BLVD SB, AUSTIN
Jun 8

Replacement of complete existing central heat and air system with or without duct work

4603 GREYSTONE DR, AUSTIN
Jun 8

RESIDENTIAL

880 HONEY GROVE WAY, Corona
Jun 8

RESIDENTIAL

1125 OAK GROVE CIR, Corona
Jun 8

We will supply and install a 18kW Air Cooled Generac generator. The generator will be placed on the left hand side of the house on a 36" aluminum stand. We will remove the existing meter/panel combo and replace it with a separate meter socket and panel. We will supply and install a 200amp Automatic Transfer Switch (ATS). An appropriately sized gas line will be installed, including any required utility upgrades or modifications.

1814 Dumaine St, New Orleans
Jun 8

Installation of six HVAC systems, including two 15-ton units, one 6-ton unit, and three 5-ton units with associated air handlers, ductwork, refrigerant piping, ventilation, and controls for a new construction church.

3516 Fourth St, New Orleans
Jun 8

remove & replace (1) 2 ton gas furnace with 24k btu and (1) 2 ton evaporator coil

5646 Evelyn Ct, New Orleans
Jun 8

Replace 2.5 ton condenser, furnace and evap coil

7935 Trout St, New Orleans
Jun 8

Replace 4 ton condenser and air handler

2423 Rev John Raphael, Jr Way, New Orleans
Jun 8

Replace 4 ton condenser, furnace and evap coil.

2524 Milan St, New Orleans
Jun 8

Replace 4 ton condenser, furnace and evap coil.

2905 Grand-Route Saint John St, New Orleans
Jun 8