Search Permits
12,301 results · type: electrical
electrical
electrical
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
INSTALLATION OF A NEW 240 VOLT 40 AMP DEDICATED CIRCUIT BREAKER FOR ENPHASE HCS-40 LEVEL 2 HARD-WIRED EV CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ENPHASE HCS-40 SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND THE ELECTRICAL SHALL COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
New Construction
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
New Construction
New Construction
New Construction
Addition and/or Alteration
Addition and/or Alteration
New Construction
Addition and/or Alteration
New Construction
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
New Construction
New Construction
Addition and/or Alteration