Search Permits
203,149 results
ePlan: Commercial Expedited Review - Change of Use from Retail to Restaurant (30160SF)
New construction of 2 story SFR
Interior Repairs for Unit 281
Total demo of sfr 4308 sqft circa 1948
Replacement of complete existing central heat and air system with or without duct work
temporary tpole for new construction in Stoney Chase Ref 2026-055423 BP
whole house water repipe. We will be cutting about 10sqft of drywall.
Replacement of an existing water heater Installing like/like G water heater.
ePlan: Commercial Expedited Review - Interior Remodel and Change of Use from Storage to Cocktail Lounge (3676 SF)
*Partial Demo* Interior remodel of two-story SFR
Total demo of 28000 steel concrete brick circa 2014
New single-family residence 3 bedrooms 2.5 bathrooms. attached garage and covered patio
Replacement of an existing water heater we are swapping out the old gas tank water heater for a similar model
*Green Building* New 2-story 4 bedroom 3.5 bathroom single family residence with attached garage covered front porch and rear covered patio.
Replacement of an existing water heater WATER HEATER TANKLESS CHANGE-OUT
1522 SF First tenant Generation Finish Out for a convenience store NO KITCHEN
New construction of SFR Condo with 3 beds 2.5 baths and attached 2 car garage PUD
*Retroactive* addition of existing SFR permit pool and deck addition (pool 450 sq. ft. and deck addition 80 sq. ft.)
New construction two-unit use 2-story 1 bedroom 1.5 bath with attached 2-car garage outdoor kitchen and 2nd floor balcony.
New construction single-family residential 2-story 5 bedroom 4.5 bath with attached 3-car garage covered front porch and covered rear patio.
Connect New Mobile Home w/ Decks (4x4 front & back)
New 1-story single family residence 4 bedroom 2 bath 2 car garage covered patio and porch
Interior remodel 4th floor areas. Existing retail.
Demo and dispose of existing electrical panel and meter
New 2-story single family dwelling condo 4 Bed/3.5 bath with attached garage and covered patio
Replacement of complete existing central heat and air system with or without duct work
Code Compliance Correction : replace (3) exterior flood lights at bldg. 18 with (3) new full cut off wall pack lights power is existing
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [4bed 3bath] with attached Carport. Unit A
Mobile Homes with Decks 2 4x4 4x4 =32
trench to repair yard sewer line