Search Permits
203,149 results
Suite 120 App. Interior remodel and demising of existing office warehouse suite 106 to create three new suites with three new elec. meters including this suite.
**EMERGENCY PERMIT NEEDED- APART COMPLEX ALTA WILDHORSE RANCH BLDG 18 UNIT #18105- METER # AE 7440206** Per notes EC only replaced meter jaws to one unit. -Hyatt
Connect New Mobile Home w/ Decks (4x4 front & back)
New Construction pond walls Pond J
Need homebuilders loop for new residence
SP Condo: New construction of a 2-story single family dwelling in a condo regime. 3 bedroom 2.5 bath with attached garage Revision 1: a 611 inspection was triggered and now it needs to be removed from multiple addresses. We need to to switch a water tap inspection from yes to not required
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater Replace 40-gallon gas water heater
Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement
ePlan: Commercial Expedited Review - Interior Remodel -Sec 6 Floors 3-4 (37300 SF).
Replacement of an existing water heater Installing 2 Natural Gas Water Heaters
ePlan: Commercial Expedited Review - Interior Remodel - Sec 2 Floors 3-4. (37200 SF).
Replacement of complete existing central heat and air system with or without duct work
COTAland Kids Pirate Ship Shade Structure ATR 11
SET NEW MOBILE HOME BASE PAD ALL HOOKUPS DECK AND SKIRTING HM 1152 SQ FT 2 4X4 DECKS 16 SQ FT EACH
15x27.5 Pool with Autofill and Heater and ASTM F1346 Automatic Safety Cover
*Type 2 RESIDENTIAL AFFORDABLE HOUSING DEVELOPMENT BONUS PROGRAM* ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [2bed 1.5bath]. Bldg 2
Unit B New 2 story 4-Unit Townhomes (Reconstruction of townhouse building due to fire partial foundation to be reused)
Per email w/ contractor: Upgrade the electrical system and includes: 1. Install a new electrical panel with a main breaker. 2. Provide and install all new branch circuit breakers. 3. Install a new electrical meter to meet local code and handle electrical load. 4. Replace overhead service with all new wiring (if overhead). 5. Install grounding and bonding system per NEC and local codes. 6. Install whole-home surge protector in compliance with NEC. 7. Permitting and
Replacement of an existing water heater Replacement of Existing Water Heater Like for Like with Expansion Tank
temporary tpole for new construction in Stoney Chase Ref 2026-055246 BP
Generator installation 5/18/26 SM - REVISED ** Ankor Solix Battery Module ATS install
New construction of a 2-story single family dwelling in a condo regime. 3 Bedroom 2.5 Bathroom Attached 2 car Garage
COTAland Star Flyer Swing Shade Structure (ATR-3)
Total demo of sfr 1000 sqft circa 1940
Connect New Mobile Home w/ Decks (4x4 front & back)
*Type 2 RESIDENTIAL AFFORDABLE HOUSING DEVELOPMENT BONUS PROGRAM* ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [2bed 1.5bath]. Bldg 3
Temp power for construction Ref: 2025-089559-BP
Unit C New 2 story 4-Unit Townhomes (Reconstruction of townhouse building due to fire partial foundation to be reused)
New single-story SFR (4br/2ba) with attached garage covered patio and covered porch EV charger is not optional. It is required per IECC 2024.