Search Permits
203,149 results
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, equipment cabinet, and 100A single phase pedestal electrical meter. New structural and electrical. Special inspections required: soils, post-installed anchors, cast-in-place foundation, and fabricated items. Results in CoC
Install two set of front lit and halo lit channel logo 34 sq ft LENNYS CRAFT BURGER on north elevation. South elevation 25 sq ft LOGO LENNYS CRAFT BURGER. Signs shall be installed per NEC 2023 with UL listed components. Total sign area 59 sq ft. Sign requirements to comply with BOA21-00828.
New Build Single Family Residence Single Story
Converting a portion (270 sf) of existing tandem garage into a new ADU addition with its own storage and covered patio. New livable addition is 730 SF. Includes Mechanical, Plumbing and Electrical improvements.
Demolish exiting light pole in ROW. Install new light pole, wireless equipment, equipment cabinet, and 100A single phase pedestal electrical meter. New structural and electrical. Special inspections required: soils, post-installed anchors, cast-in-place foundation, and fabricated items. Results in CoC
INSTALLATION OF A NEW 240 VOLT 40 AMP DEDICATED CIRCUIT BREAKER FOR ENPHASE HCS-40 LEVEL 2 HARD-WIRED EV CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ENPHASE HCS-40 SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND THE ELECTRICAL SHALL COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
CONSTRUCT A 707 SF SWIMMING POOL WITH DIVING BOARD. NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF ME
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
Installation of two open channel lettersets with marque bulbs with clear acrylic faces THE YARD and LED illuminated black aluminum cabinet with clear acrylic push-thru letters mounted flush to existing fascia MILK SHAKE BAR on north elevation 21 sq. ft. and 54 sq. ft. on west elevation. Signage to comply with §11-41-3B2 of Mesa Zoning Ordinance, incorporate a dimming and/or a screening device when using bulbs rated at greater than eleven 11 watts, or equivalent measurement: and not exceed a rati
Please do not request inspections under this permit until 2 business days after permit issuance.FOOD TRUCK OUTLET INSTALL AT GAS STATION
Please do not request inspections under this permit until 2 business days after permit issuance.Traffic Signal Cabinet Relocate
Please do not request inspections under this permit until 2 business days after permit issuance.Scope includes installation of new speed enforcement traffic equipment on an existing pole. Existing power source to be utilized; no new service required.
100 feet gas line, 12 outlets, 3 tankless water heaters 200,000/each, 2 dryers 25,000/each, 1 stove 50,000 each, 6 gas lights 1,000/each
remove drywall and insulation , paint interior, replace drywall and insulation, baseboard and shoe molding.
4 ton Electric system installed with ductwork
Need to connect power back on, tenant was out for 1year
Addition to main level of house to add 2 new office spaces, and porch. Reconfigure existing rooms to provide for new master bed/bathroom, closets, kitchen shelving, office space and laundry room. *FINAL INSPECTION* Any new ground level square footage must match the existing first floor elevation.
House caught fire. Replacing all floors, drywall, windows, new kitchen, doors and insulation in part of house. Electric and plumbing too in main section. The other section is getting new trim, some drywall, paint and new doors Non-structural renovations to consist of carpentry, cabinets/counter, siding repairs, windows, flooring, cabinets, paint, plumbing, electrical, and HVAC as per plans.
Restaurant - Pizzeria & Italian Cuisine Combining Suites A and B plumbing, electrical, minor roofing, HVAC work
Rebuilding 3 sagging foundation piers to level floor. Renovating small kitchen, by removing old cabinets and countertops, installing new sink, dishwasher, refrigerator, stove, range hood, and upgrading 3 wall outs to GFCI. New backsplash, and Painting kitchen walls.
No Power Over Six Months
HVAC installation
Install 22kw Whole Home Generator
Replacement of Air-handler & furnace only. Ducts & linesets to remain
Replace air-handler & furnance only. Ducts and linesets to remain.
New electrical construction
Replace electrical panels and drywall from fire damages. Replace 2 electrical panels (only 1 has fire damage) and do drywall repair.
6 months vacancy inspection
Install 30 electric gallon water heater
Install 30 gallon electric water heater