Search Permits
12,220 results · type: electrical
Electrical
Electrical
SOLAR PV WITH ESS
PANEL UPGRADE SAME LOCATION
ELECTRICAL RESIDENTIAL
SOLAR PV WITH ESS
PANEL UPGRADE SAME LOCATION
SOLAR PV WITH ESS
PANEL UPGRADE SAME LOCATION
ELECTRICAL RESIDENTIAL
SOLAR PV WITH ESS
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
INSTALLATION OF A NEW 240 VOLT 40 AMP DEDICATED CIRCUIT BREAKER FOR ENPHASE HCS-40 LEVEL 2 HARD-WIRED EV CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ENPHASE HCS-40 SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND THE ELECTRICAL SHALL COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
Need to connect power back on, tenant was out for 1year
No Power Over Six Months
New electrical construction
6 months vacancy inspection
gunite pool wiring
Re-wiring
Over Six Months No Power
Install 200 amp Service with circuit breakers
Install 200amp service with circuit breakers.
New Construction Apartments
New Construction Apartments
New Construction Apartments
New Construction Apartments
Electric Vehicle Charger
New Construction Apartments
New Construction Apartments