Search Permits
4,234 results · type: plumbing
COMMERCIAL
COMMERCIAL
COMMERCIAL
COMMERCIAL
RESIDENTIAL
COMMERCIAL
COMMERCIAL
Remodel - Bathroom Shower - 13 SF remodel to converting tub to shower, replacing pan, drain, and valves. Drain pipe to remain in place. Existing post tension slab.
Converting tub to tub, replacing pan, drain, and valves.
Installation of 90-ft of .75-in PE gas line buried 18-in with 18-gauge tracer wire from gas meter to 55K BTU BBQ. All gas lines are to be installed per 2024 IFGC & COM gas requirements. Contact COM gas engineering at 480-644-2909 to determine if the meter needs to be upgraded.
WATER METER RELOCATION MOVING 2 1/2 FT EAST
Converting shower to shower, replacing pan, drain, and valves at existing townhome. No change to overall square footage.
Shower Remodel in Master Bathroom. No structural changes - will tie into existing piping. No change to overall square footage.
Main bath: Like-for-like shower replacement with 60x34 preformed shower base, no drain relocation, no structural changes at existing SFR. Wall system to 96-inch ceiling height. Toilet replacement. Hall bath: Like-for-like shower replacement with 60x34 preformed shower base, no drain relocation, no structural changes. Wall system to 96-inch ceiling height.
plumbing
Installation of new gas piping rough-ins, new domestic water supply lines, and new waste and vent piping cellar through the 3rd floor.
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#X01386212-I1.
1. EXISTING 2 FAMILY HOUSE WITH PLUMBING WORK AT GROUND, 1ST AND 2ND FLOOR . JOB FILED TO RELATED TO ALT2 APPLICATION# B01416842-I1.2. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THISAPPLICATION.
PLUMBING RENOVATION (NEW AND RELOCATED BATHROOMS), NEW DISHWASHER AND WASHER, NEW KITCHEN SINK. IN NEW APARTMENTS 2nd Floor (apt 201-A, 201-B and 201-C), 8th Floor, (apt 803-A and 803-B) 10 Floor (apt 1002-A and 1002-B), 11 Floor (apt 1102-A and 1102-B)
Plumbing plans for existing residential building undergoing an alteration.
CAP& REMOVE EXISTING PLUMBING FIXTURES, INSTALL NEW PLUMBING FIXTURES AS PER PLANS FOR THIS (2) TWO FAMILY DWELLING UNITS FILED IN CONJUNCTION WITH ALT APPLICATION #B01413257-I1 NEW PLUMBING FIXTURES AS PER PLANS.
FILE PLUMBING WORK AT CELLAR OF EXISTING 3-FAMILY TO INSTALL BOILER AND HWH AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
HEREBY FILING FOR THE INSTALLATION OF FIXTURES IN CONJUNCTION WITH TENANT FIT OUT. NO CHANGE TO USE OCCUPANCY OR EGRESS.Chipotle; space 0176
INSTALL (2) REPLACEMENT HOT WATER HEATERS, (2) STORAGE TANKS AND CONNECT TO EXISTING GAS PIPING AND VENTING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
PLUMBING WORK IN CONNECTION WITH INTERIOR RENOVATION OF THREE DWELLING UNITS. RELOCATE KITCHENS, INSTALL NEW BATHROOMs as per submitted plans.
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
CONNECT EXISTING GAS PIPING TO REPLACEMENT GAS BOILER AND HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
COMBINATION OF APTS FILED IN CONJUNCTION WITH DDB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
APPLICATION FILED HEREWITH TO REMOVE EXISTING STALL SHOWER IN BASEMENT.
FILING PLUMBING WORK TYPE TO CONVERT FROM OIL TO GAS FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.