Search Permits
12,027 results · type: mechanical
mechanical
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
HEREWITH FILING REMOVAL AND REPLACEMENT OF EXISTING PACKAGE ROOFTOP UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
TEMPORARY ROOF PROTECTION AS PER DRAWINGS. ROOF/WINDOW PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of Paint Spray Booth & Mixing Room, Duct work from units up to roof for Exhaust, Installation of Dry Chem fire suppression. No change to CO, Egress, or Occupancy.
INSTALLATION OF TEMPORARY BARRIERS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of a temporary roof protection via scaffold with netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing new Mechanical System (Heating System, Ventilation System, Air-conditioning Systems, Associated Ducts and Piping) in conjunction with NB #B01008423-I1
INTERIRO RENOVATION IN EXISTING TEA BAR ON 1ST AND ROOF, INSTALL NEW COOKING EQUIPMENT AND HOOD EXHAUST AS PER PLAN. FIRE SUPPRESSION SYSTEM WILL BE FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Mechanical changes as indicated on plans.
SUBSEQUENT APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCT WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Hereby filing to install new mechanical units with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Replacing existing split heat pump system serving sales area on ground floor.
Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
HVAC APPLICATION FILED TO COMPLY WITH DOB COMPLIANTS. NO CHANGETO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS FILED HEREIN
AC UNITS UNSTALATION FOR APT. 17CD AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Modify ductwork on partial 4th floor to accommodate office renovations as per plans filed herewith only.
INSTALLATION OF FIVE (5) REPLACEMENT ROOFTOP HVAC UNITS MOUNTED ON EXISTING SUPPORTS AND CONNECTED TO EXISTING DUCTWORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing herewith drawings indicating modification of the Mechanical system on the 22nd floor construction (marketed as the 23rd floor). No change in use, egress, or occupancy under this application.
install 1 condenser at 1st floor facing alley way and (2) cassette wall mounted air handlers at ceiling. no change in use, egress or occupancy.
INSTALLATION OF ENCLOSURE SYSTEM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Replace existing two (2) corridor air handling units and one (1) lobby air handling unit located in the cellar. with new air handlers along with associated piping, ductwork, controls, support and accessories. No change to use, egress, or occupancy.