Search Permits
203,149 results
Temporary Power Pole for construction use. Building 9 Permit No. 2024-160856 BP
Upgrade main electrical panel and meter
Replacement of an existing water heater Replacing an existing Water Heater
Replaced gas main from meter to gas water heater and gas furnace.
New pool and spa
Install new energy storage system and EV wall connector to existing single family residence. Underground AE
Replacement of complete existing central heat and air system with or without duct work
Suite 110 App. Interior remodel and demising of existing office warehouse suite 106 to create three new suites with three new elec. meters including this suite. The same building already has a suite 106 on the other side.
Interior Remodel- minor changes to structural framing updates to electrical plumbing hvac.
ePlan: Commercial Expedited Review - Tenant Finish out of Office Space (100000 SF).
*Partial Demo* Retroactive permit of screened in porch and front porch addition. Interior remodel to two-story SFR. Removal of existing IC to bring lot into compliance.
Replacement of an existing water heater install tankless water heater
ATR-25 Telecombat - New Amusement Park Ride. [7 Day Review]
Estonian 3316 C Left New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 680.46 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 26-11 Actual Bld height: 26-11 required parking: 2.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 5.5bath] with Attached Garage
This development proposes demolition of the interior and exterior walls. It is proposed that the structure is to be retained in the existing part of the building; addition of a substantial amount of area over all is proposed AISD Project
Temporary Power Pole for construction use. Building 10 Permit No. 2024-160857 BP
gunite swimming pool
Total demo of SFR 1288 sq ft circa 1949 and Detached garage 360 sq ft circa 1949 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Mechanical Electrical and plumbing infrastructure replacement of existing equipment that has passed its service life. Work to be performed in Electrical and Mechanical rooms across the existing building in multiple Mechanical rooms
ePlan: Commercial Expedited Review - Tenant Finish out of Office Space (100000 SF).
Permit for a Euphoria EV charger 60 amp circuit inside a garage.
Excavate 6 tunnel to repari main drain line under house
120/240v service to supply T-Mobile Cellular Equipment. Adding new meter and disconnect to an existing co locate gutter and tap can.
Replacement of complete existing central heat and air system with or without duct work Replace HVAC Unit 1 for 1
Freestone S353 B Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Temporary Power Pole for construction use. Building 4 Permit No. 2024-160850 BP
Install one channel letter sign for HOLY PICKLE
* Interior remodel partial garage conversion covered porch enclosure
48 Amp car charger with 60A overcurrent protection.