Search Permits
12,220 results · type: electrical
Standalone upgrade permit needed to demo and relocate lift station meter 25ft from current location.
Interior Remodel New electrical system mechanical system paint flooring interior doors plumbing fixtures & cabinets. New exterior paint and asphalt shingle roof.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 4.5bath] with Attached Garage. RELATED TO EP 2025 124162.
electrical_permit_(r)
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
SOLAR PV WITH ESS
ELECTRICAL VEHICLE CHARGING STATION
ELECTRICAL VEHICLE CHARGING STATION
The inspection of the site identified the following: Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. This structure is to be restored like for like in compliance with 2017 NEC, 2018 IRC/IBC requirements. Any al
“Installation from 100 to 200 Amp electric service -for units A, B and C no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.”
PERMIT IS ONLY FOR INSTALLATION OF TWO ECO FLOW OCEAN PRO BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER UNDER CARPORT. REPLACEMENT OF 200 AMP ELECTRIC PANEL. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR PERMIT. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Use existing light wiring to add GFCI 110v outlets and wiring for future ceiling fans. No new circuits to be added.
PERMIT IS ONLY FOR THE INSTALLATION OF FIVE FOXESS BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND C