Search Permits
202,811 results
Electrical vacancy
Electrical vacancy
Electrical vacancy
Electrical vacancy
Electrical vacancy
Electrical vacancy
Electrical vacancy
Electrical vacancy
Electrical vacancy
Electrical vacancy
Electrical vacancy
Install a 100a main lug sub panel and run 14 new circuits out of this new sub panel to power the unit. Installed grounding and whole home surge to code.
Gunite pool wiring
repair old gas line and vacancy
Electrical vacancy
Electrical vacancy
Construction loop , temporary pole
Electrical vacancy
Electrical vacancy
Install ductless mini-split heat pump 2-zone system 2 1/2 ton capacity. After-the-fact application - equipment installed previously without permit. See inspection photos.
New construction for two family housing
Tear off old roof. Re-felt and add new roof. Changeout any rotted decking as needed. *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Inspection on a electric water heater. ADD: STOVE AND DRYER
Inspection on a electric water heater. ADD: STOVE AND DRYER
Inspection on a electric water heater ADD: STOVE AND DRYER
MAIN SERVICE REPAIRS, GROUND SYSTEM AND SURGE PROTECTION.
New construction for two family housing
New construction for two family housing.
Lower Switches 1" to 2" , move receptacles sideways as needed for access Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property
Lower switches 1" to 2", move receptacles sideways for better access as needed. Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property