Search Permits
12,220 results · type: electrical
Addition and/or Alteration
Addition and/or Alteration
Standard residential upgrade of service entrance to property. Existing service is underground 120/240 with 150A main breaker. Upgrade to 200A service.
Proposed non-structural remodel - bathroom remodels as well as adding a new 1/2 bath.
Main service upgrade
CHANGE OF USE from Retail Sales to Grocery Store; Install Grease Trap
Shabuyaki Wall Sign West
Remove aluminum branch circuit wiring smaller than #10 AWG and replace with proper size copper wire Replace or retrofit outlets switches and junction devices as needed* Breaker replacement circuit separation and neutral configuration: Eliminate any shared neutrals (multi-wire branch circuits) Supply and install a whole-house surge protection device at the main electrical panel
Lot 8 block A: New construction two family residential duplex 2-story 3/3 bedroom 2.5/ 2.5 bath with attached 1-car garage (both units) covered front porch (both units) and covered rear patio (both units). 4511 VINSON DR UNIT 8A 4511 VINSON DR UNIT 8B
Request electrical Permit for a Temp Pole 2026 048392 000 00 BP
2458BL NEW 2 STORY 4 BEDROOM 3 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Express - Replace 400 sqft of decking and shingles Upgrade electrical service Panel Tub to shower in master bathroom
2897BR NEW 2 STORY 4 BEDROOM 2 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Worley - 39-51616 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. EC is requesting wire pull
Temporary power pole for remodel. Ref 2026-058932 BP
New in ground pool pavers pervious turf installation and planters Total proposed Impervious Cover: 4609 sqft at 35.9%
additional lighting Per contractor via email (5/7/26): Dock lighting. Installing 4 lights in the ceiling there is already power on this we are just tapping into it to run power.
New construction of SFR Condo with 3 beds 2.5 baths and attached 2 car garage PUD
Addition and Remodel to Existing 2-Story Single Family Residence. Remodel includes new doors remodel of kitchen and living room new master bathroom on first floor. Addition includes 2 new bedrooms playroom and bathroom on second floor.
Bldg 3 New pool (autofill) 144 Sf
temporary tpole for new construction in Stoney chase Ref: 2026-056205-BP
Moscoso S423 C Right New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Change of Use Office to Retail - Interior Finish Out
ePlan: Commercial Expedited Review - Interior Remodel of Floor 13 (36112 SF)
Demolition and remodel of office spaces.
Interior Remodel of master bathroom
ePlan: Commercial Expedited Review - Interior Remodel of Floor 14 (35185 SF).
Wall sign for Shabuyaki East
INTERIOR REMODEL OF EXISTING OFFICE SPACE
200amp panel 200amp meter grounding