Search Permits
202,811 results
Replacement of complete existing central heat and air system with or without duct work **KEITH SIBSON - Remove and replace existing 3-ton horizontal gas system like-for-like; no structural change.
Express: James hardie siding replacement-1200-1500 sqft
Interior renovation to the basement level of an existing mercantile space to include accessible route from existing elevator to existing mercantile area. New elevator replacement permitted separately not in this scope of work. No access control.
15-25 Day INSTALL new (2) Make-up Air units and some exhaust duct work for customers existing equipment
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4bath] with Habitable Attic basement and Attached Garage
Install one monument sign for WOODLAND PLACE
Replacement of complete existing central heat and air system with or without duct work
Interior remodel to an existing single-family residence to include new mechanical new electrical new plumbing new windows etc. (The Exterior patio cover permitted (1996-011143 BP) will be removed. The patio cover was constructed and the permit expired.) (The permit has been reactivated for use however the cover will be removed due to condition and will not be reconstructed.)
ETJ- New Commercial for Tesla 1000 sq. ft. Run gas piping in high bay 56.1 thru 57.4 and non1 thru r.2
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5T horizontal gas system
Express- Installing 15 push piers
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3.5 Ton Heat Pump system
Replace all sewer lines in the yard and under the house.
Weather head and Mask kit
Total demo of sfr 1964 sqft circa 1950
New construction of single family dwelling with 5 bedrooms and 5.5 baths 3 car garage rear patio and front porch PUD
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [5bed 5.5bath] Work to include: First floor addition and Interior remodel.
New inground pool and concrete deck
New construction of single family dwelling with 3 bedrooms and 2 baths 2 car garage rear patio and front porch PUD
emergency repairs for duplex electric service. Per contractor emergency rebuild of services meter work on 2 meters of the duplex. Work is being done on unit a and b (5/14/26).
Interior remodel to existing business admin office. Access Control requested.
Addition and Remodel to Existing 1-story single family residence. Remodel of bedrooms & bathrooms kitchen & living space. Addition of covered rear porch beyond current porch footprint. 4 bedroom 3 bath.
Install Level 2 EV Charger
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton AC System
Replacement of complete existing central heat and air system with or without duct work
REMODEL EXISTING KITCHEN. UPGRADE CABINET. UPGRADE COUNTERTOP. DEMO/RELOCATE ONE BEAM IN KITCHEN
Remodel for existing McDonalds.
New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (Unit A) Revision 1: a 611 inspection was triggered and now it needs to be removed from multiple addresses. We need to to switch a water tap inspection from yes to not required
Tenant process improvement including demising wall for production room exterior gas storage enclosure and gas piping for production.
We will be trenching and replacing a 25ft section of the sewer line