PermitDig

Search Permits

12,027 results · type: mechanical

6-month gas test

2038 Valmont St, New Orleans
Jun 12

6-month gas test

2036 Valmont St, New Orleans
Jun 12

6-month gas test

2032 Valmont St, New Orleans
Jun 12

Install 3 ton hvac system

3 Island Club Dr, New Orleans
Jun 12

Rough in 3/4” galvanized gas piping for range and hot tankless water heater for apartment 1A

2129 Desire St Apt 1A, New Orleans
Jun 12

mechanical

7409 HOOPER STREET, Norfolk
0KJun 12

mechanical equipment to assist with full demolition from within and loading out of debris.

182 MONTROSE AVENUE, Brooklyn
5KJun 12

mechanical means will be used to assist from within the structure and to load out debris.

172 MONTROSE AVENUE, Brooklyn
5KJun 12

Installation of Concrete pump as per plans filed herewith. No change in use, egress or occupancy.

175 PEARL STREET, Brooklyn
1KJun 12

Provide HVAC for tenant space on portion of the 9 floor as per plan filed

1995 BROADWAY, Manhattan
72KJun 12

EQUIPMENT USE: INSTALLATION OF A TEMPORARY PERSONNEL HOIST(CAR#1) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.

635 WEST 165 STREET, Manhattan
10KJun 12

INSTALLATION OF ROOF PROTECTION AND ROOF OVERHEAD PROTECTION. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC

45 EAST 66 STREET, Manhattan
20KJun 12

INSTALLATION OF TEMPORARY BARRICADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

89 MASPETH AVENUE, Brooklyn
4KJun 12

Use of Knuckleboom for building construction. This application is filed in conjunction with NB X00908433

1320 INWOOD AVENUE, Bronx
5KJun 12

Use of Knuckleboom for building construction. This application is filed in conjunction with NB B01225983-I1

229 SHEPHERD AVENUE, Brooklyn
5KJun 12

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

5 EAST 81 STREET, Manhattan
5KJun 12

Direct replacement of (4) chillers on the roof on existing steel dunnage. All existing duct work to remain. No change in use egress and occupancy.

1901 OCEAN PARKWAY, Brooklyn
200KJun 12

INSTALLATION OF TEMPORARY CHUTE AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.

54 NAGLE AVENUE, Manhattan
1KJun 12

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

1530 BERGEN STREET, Brooklyn
4KJun 12

INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

57 WILLOUGHBY STREET, Brooklyn
3KJun 12

HEREWITH FILING FOR MODIFICATIONS TO THE Existing MECHANICAL SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

16 EAST 34 STREET, Manhattan
150KJun 12

Installation Of Temporary Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

90 RIVERSIDE DRIVE, Manhattan
3KJun 12

Replacement of rooftop air conditioning unit on existing steel dunnage. All existing ductwork to remain. No change in use egress and occupancy.

69-03 FRESH POND ROAD, Queens
30KJun 12

Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

280 EAST 203 STREET, Bronx
Jun 12

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

525 SAINT MARKS AVENUE, Brooklyn
4KJun 12

Mechanical work filed in conjunction with an alteration renovation at an existing second-floor residential space. No change to use, egress or occupancy.

85 FIFTH AVENUE, Manhattan
78KJun 12

Mechanical modifications taking place on Cellar, 1st thru 4th floors, Roof as per plans filed herewith. No change in use, egress or occupancy.

138 WEST 90 STREET, Manhattan
1.5MJun 12

Mechanical plans for new 1 family residential house with ADU

19 CHAMPLAIN AVENUE, Staten Island
Jun 12

Mechanical plans for new 1 family residential house with ADU

15 CHAMPLAIN AVENUE, Staten Island
Jun 12

Mechanical modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupancy

60 CHARLTON STREET, Manhattan
190KJun 12