Search Permits
202,236 results
SP Condo: New 3 story SFR with 2 car garage 3 bedrooms 2.5 baths
Interior finish-out
Demo SFR 1293 sqft and detached garage Built 1950 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport. Bldg 2
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport. Bldg 1
temporary tpole for new construction in Stoney Chase
Navien 240A2 tankless water heater Located in garage
New 2-story single family residence 4 bed/4.5 bath with attached garage covered porch and patio
Remodel for existing McDonalds.
irrigation install
Tenant Office Build Out for Suite 100 - No Change of Use No Access Control. No Hazmat as this as spec suite.
Replacement of complete existing central heat and air system with or without duct work PECAN PARK MH PARK PHS 1 SPACE 112
Express- RR Reroof Asphalt shingle to shingle.
Replacement of an existing water heater Replacement of an existing water heater Replace 40-gallon electric water heater Located in hallway closet UNT 1042 BLD H TRAVIS OAKS CONDOMINIUMS AMENDE
(Patel Ronak) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Express: foundation repair
(Sepulveda Joe Treehouse) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Homebuilders loop for New SFR ref 2026-046467 BP. Austin Full purpose
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Remove existing Furnace and replace with a Goodman - Remove Both plenums and install new plenums - Remove all existing duct work for the downstairs unit - Redesign new duct work lay out and replace install.
***Timed In-Person Inspection: 06/04/2026 @ 1 PM*** Replacement of an existing water heater Replacing like/like G water heater in Garage.
Diagnostic revealed broken wye underneath the foundation in the master bathroom. The wye is either a 2 wye or a 3x2 wye. Plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs. Begin by utilizing specialized equipment to scan concrete to locate where either the rebar or tension cables are located so we can create a direct access entry hole located in the master bathroom. Card board will be used to protect wall and carpet in the
Boone S413 B Left New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
New three-story condo duplex 4 bed 2.5 Bath with attached covered patio
septic tank cut over to tie into city tap
New Construction Office Whse spec - Building 6 - Concurrent Review: SP-2022-0136C
Briscoe 820-Q-L Is a New one-story single-family residence with (3) bedrooms (2) bathrooms an attached two-car garage and a covered entry porch and patio.
Replacement of complete existing central heat and air system with or without duct work unit 225
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
Kitchen and bath updates in place; fixture flooring and tile replacement. Tankless water heater install with venting/electrical AC plenum replacement subpanel upgrade. Gas line cap and fireplace insert/surround removal. Eliminate partition between vanity/shower in hall bath. No changes to footprint or structural/ load framing