Search Permits
202,236 results
Interior demolition of the existing AZ International Marketplace located at the NEC of Dobson and Broadway Rd. Interior walls to be removed and demolished are non-load bearing wall. All work to be performed per the 2018 IBC, section 3303.
New 2406 SF single story residence with a 2 car garage at AVALON CROSSING. Includes a new water, electric and gas meter. Includes an option of a tandem garage
EXPEDITE - Install new 200 Amp-120/240V electrical service for the existing building. Results in CoC.
Install one (1) 8' x 4'4" LED Halo illuminated building logo attached to west elevation of PH02 building. 35 sq. ft.
Construct a 402-sf swimming pool, no spa/no gas. All electrical to comply with 2017 NEC requirements. This permit does not include any accessory structures. Registered structural professional engineer: Alan E. Money #30895, expires 12/31/26. Ref MST19-00383. Engineering and structural calculations are required to be onsite for all inspections and options highlighted. These plans must conform to the requirements of the 2018 international swimming pool & spa code with all City of Mesa Amendments.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Installation of 13.50 kWh battery
NSFR ADDITION OF 43 SF OUTDOOR LIVING PATIO AREA. APPROVED UNDER MST22-18689. REF. NSFR PERMIT PMT26-02209.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Tenant improvement in existing 229,881 SF, type VB construction, group B and S1 occupancy warehouse. Modification includes replacing and re-adjusting production assembly line, install of fix windows between warehouse and office, install of a chain linked area at battery charging station area and associated plumbing and electrical power and lighting and new 200amp electrical meter. No change to overall occupancy count or occupancy designation. No modifications to fire protection systems. Approved
New demising wall in an existing type V-B construction warehouse building. Creating a shell 121, 8,562 SF and a 25,195 SF B and S-1 spec suite 126. Scope of work is for demising wall and separation of HVAC and electrical only. Deferred fire sprinklers. Results CoO for Spec suite.
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit
Shower Remodel in Master Bathroom at existing SFR - Replace existing wet space with new shower including new valve and prefabricated acrylic walls. No structural changes - will tie into existing piping. Existing bathtub in primary bedroom also to be removed. No change to overall square footage.
PERMIT IS ONLY FOR INSTALLATION OF TWO FRANKLIN WH AC-COUPLED BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
Renovation in an existing V-B construction B occupancy medical suite. Converting an existing examination room to waiting room, new patient restroom, and sink in the existing Hot Lab room. Deferred fire sprinklers. Results in CoC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Installation of front-lit pan-channel lettering & logo
Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction
Run 6 awg copper wire in wall over attic to garage location at existing SFR
Titan Alarm to install (2) relay for the shop fans
New Construction as per plans.
This project modernizes an existing gymnasium, cafeteria, and support areas to improve overall functionality and accessibility. The core of the work involves interior renovations, including surface finishes, upgraded utility systems, and the installation of a new ADA-compliant elevator. Only minor exterior modifications and selective demolition are required to accommodate the new layout and structural changes.
Run 100 ft of high pressure gas line to supply a whole home generator, central heater, water heater, 2 dryers and a stove. Meter upgrade needed.
Extend gas line piping 10'' to Reconnect gas meter after house elevation. Troy Jeffreys, 504-232-7880.
Installation of a 22kw whole home generator
installation of a 28kw whole home generator
Run new gas line for stove, dryer, central heater, and tankless water heater. Install tankless water heater. File and have inspection with City of New Orleans Mechanical Department.
Temporary disconnect/reconnect needed to finish solar installation
Install a new gas line, and 2 water heaters.
26-11565-RNVN Two-Family, Conversion from Single Family to Two-Family. KEEP 4225 S Roman St New Orleans, LA 70125 (AM10830864) ADD 4223 S Roman St New Orleans, LA 70125