Search Permits
12,027 results · type: mechanical
Replacement of mini-split system Install replacement of 18k BTU Mini-Split System
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [4 bed 3bath] with Attached Garage covered porch/patio.
Interior Remodel- Update kitchen flooring paint. Update bathrooms with new tile and cabinetry. All new windows and doors. New garage door and exterior paint. Update HVAC new plumbing electrical fixtures.
New construction of single-family dwelling with 4 bedrooms and 3.5 baths 3 car garage rear patio and front porch
Interior Only Tenant Finish Out of Office Shell.
Replacement of complete existing central heat and air system with or without duct work
NEW C-STORE W/ RESTAURANT SP-2023-0446C - In Review
Estonian 3316 C Right New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio FFE: 687.01 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 26-11 Actual Bld height: 26-11
Bradford 3315 C Right New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.66 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 26-9 Actual Bld height: 26-9 required parking: 2.
New 2-story 4 bedroom 3.5 bathroom small lot single family residence with attached garage covered front porch rear covered patio and 2nd floor covered balcony.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
mechanical_permit_(c)
RESIDENTIAL - FAU AND AC CHANGE OUT
RESIDENTIAL - FAU AND AC CHANGE OUT
RESIDENTIAL - FAU AND AC CHANGE OUT
26 kW Generator Installation ** Entergy Elec / Delta Gas
Install a new 3 ton A/C & heating systems on the first floor and a 3 ton A/C heating system for the second floor. New ducts, boxes, grills, copper tubing & thermostats for the first & second floor.
3 TON AIR HANDLER & CONDENSER
File permit to test systems for leaks and Delta Utilities turn off.
Installation #2 of 3 Ton AC Units
Repair gas leak in the kitchen area. Gas line was locked off by Delta Gas.
Gas line. New water heater, stove, dryer and a/c
GAS VACANCY- METER RELEASE
GAS METER OUT OVER 6 MOS.
mechanical
mechanical
TEMPORARY NEEDLE BEAM PLATFORMS AS PER DRAWINGS. NEEDLE BEAM PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.