Search Permits
2,736 results · type: residential
New Construction
Make Safe Permit For RP
New Construction
Addition and/or Alteration
Kitchen and 3 bathroom remodel
NEW SFR - LOT 56
Addition and/or Alteration
Replace Windows, Insulation on exterior walls and ceilings. Replace drywall on exterior walls and ceilings., flooring installation, kitchen cabinetry installation, Plumbing and electrical will be done by other party.
5496 Lake Le Clare Rd, Lutz FL 33558
Private Provider Inspections- NEW INGROUND - POF - NO GAS - PP INSP ONLY
ACCESSORY DWELLING MOBILE HOME SETUP TO 15C, ELECTRICAL, MECHANICA, PLUMBING
Addition to the main house and alteration. HC-CMP-26-0000101
Remove and replace existing pool cage per plans provided.
Screen enclosure with a section of insulated aluminum panels over proposed concrete footer and pool deck
32' x 48' screen enclosure
replace all existing windows with impact resistant windows
Private Provider Plan Review and Inspections- NEW SFR - LOT 29
30' x 34' screen enclosure
Reference HC-CMP-25-0000567**A.T.F. ACCESSORY STRUCTURE
6907 Keepers Pl, Tampa FL 33617
CSR / SFR / BLKT LAL
Redesigned open porch.
44' x 51' screen enclsoure
Private Provider Inspections- LANAI PATIO ENCLOSURE HC-CMP-26-0000292
INGROUND CONCRETE POOL,SPA,DECK AND 18'' + - ALL AROUND POOL DECK
Construct 2-story, 6,035 SF, (4) unit facility with garages. Group R-2 occupancy. V-A construction. Special inspection required for reinforced steel, concrete, masonry, anchoring, epoxy. (4) 1-ph electrical panels. DEFERRED FIRE SPRINKLERS. DEFERRED FIRE ALARM. Related to civil permit PMT24-05928.
Construct three-story, 6,525 SF, (3) Unit apartment facility with garages. Group R-2 occupancy. V-A construction. Special inspection required for reinforced steel, concrete, masonry, anchoring, epoxy. (3) 1-ph electrical panels. DEFERRED FIRE SPRINKLERS. DEFERRED FIRE ALARM. Related to civil permit PMT24-05928.
Existing roof replacement FORTIFIED RE ROOF PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: •Removal of existing roof material •Installation of water intrusion resistant underlayment •Installation of the drip-edge and flashing •Installation of shingles or metal panels
Fortified Roof Replacement two-family home 5301 Magazine PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded to t
OC Roof Replacement - Platinum Package - Owens Corning™: DURATION® - Owens Corning™: PROEDGE® Hip & Ridge Shingles - Owens Corning™: Install Synthetic Underlayment for added Protection Against Moisture & Wind Driven Rain. - Remove & Replace Ventilation (Ridge Vent and/or Square Vent) - Bullet Boots - Install Starter Shingle - Chimney Reseal and install Ice & Water shield. (if applicable) - Remove & Replace Drip edge. - Owens Corning™: Install Ice & Water Shield per code to help prote