Search Permits
202,236 results
Electrical service permit for Apt 513 at 4420 Dauphine St.
Electrical service permit for Apt 511 at 4420 Dauphine St.
Electrical service permit for Apt 510 at 4420 Dauphine St.
Electrical service permit for Apt 509 at 4420 Dauphine St.
Fortified Roof Replacement *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Remove and replace 40 squares of shingles. this roof will be FORTIFIED. *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Electrical service permit for Apt 508 at 4420 Dauphine St.
Electrical service permit for Apt 505 at 4420 Dauphine St.
Electrical service permit for Apt 506 at 4420 Dauphine St.
Electrical service permit for Apt 507 at 4420 Dauphine St.
Electrical service permit for Apt 503 at 4420 Dauphine St.
Electrical service permit for Apt 501 at 4420 Dauphine St.
Installation of roof mounted solar panels. no eligible for Solar App
Electrical wiring, lighting fixtures and distribution equipment installation.
Electrical wiring, lighting fixtures and distribution equipment installation.
Solar Permitting for Greenlancer Client. Install Array grounding. Wire manage romex in attic. Install ground rods as needed.
Electrical wiring, lighting fixtures and distribution equipment installation.
Electrical wiring, lighting fixtures and distribution equipment installation.
Electrical wiring, lighting fixtures and distribution equipment installation.
Solar permitting for Greenlancer. Will need a temporary disconnect/reconnect
Electrical wiring, lighting fixtures and distribution equipment installation.
Electrical wiring, lighting fixtures and distribution equipment installation.
Electrical wiring, lighting fixtures and distribution equipment installation.
Renovation of vacant and blighted 2 story building. All new electrical, plumbing, Air-Conditioning, roofing. There will be no change to the footprint of the building. This was approved by HDLC on April 4, 2024, but that application has since been canceled. *FINAL INSPECTION* Final FEMA EC BFE +2.1 NAVD
File permit for out over six months.
Electrical wiring, lighting fixtures and distribution equipment installation.
File permit for out over six months.
File permit for out over six months.
Electrical wiring, lighting fixtures and distribution equipment installation.
Electrical wiring, lighting fixtures and distribution equipment installation.