Search Permits
12,139 results · type: electrical
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 5.5bath] with Attached Garage.
ePlan: Residential Expedited Review - Interior Remodel to Existing 1-Story single Family Res. 6-23-26 SM - ** REVISED ** Unpermitted remodel of the following areas: Full kitchen remodel with new island remove walls to open floor plan Full remodel primary bath with new sanitation shower/ tub wet zone cosmetic upgrade of secondary bath. All windows and doors were updated new double slider in the living room (header replaced). All wiring changed out with new devices and lighting. New sub panel a
Addition to existing single-family residence. Addition of attached 1-story guest room with bathroom workshop and covered deck. Electrical panel upgrade. 4 bedrooms/3-bathroom driveway improvements retroactively permitting attached uncovered wood deck. Rolling in expired permit 2012-098146 BP Install 1 exterior replacement door on the existing single-family residence.
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
ELECTRICAL VEHICLE CHARGING STATION
MISCELLANEOUS ELECTRICAL
PANEL UPGRADE SAME LOCATION
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Installation of 13.50 kWh battery
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE