Search Permits
201,887 results
unit 409c: remodel 2 bathrooms & 1 kitchen in kind, new cabinets, plumbing fixtures, new electrical, replace closet cabinets, door etc. new led recessed lights thru out, no exterior work, no wall stud demolition or construction, no change in plumbing fixture count, no change in room layout or use.
voluntary structural upgrade at ground floor. replacement of existing dropped wooden beams for new steel beam in the same location. no additional changes or scope of work above.
2nd flr only - 1) kitchen and bathroom remodeling like for like; 2) convert closet to (n) laundry room(washer & dryer);3)install new elect sub panel; 4) change patio door to swing door(not visible from street). 5)attic access ladder
to obtain final inspection for work approved under pa#'s 202501087964 and 202501098049. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
interior remodel with structural, mechanical and plumbing revisions
install 5/8" tr foundation bolts @ 48" oc 7" min embedment. install 1/2" struc 1 plywood at portions of garage walls. repair spalling foundation surface with polymer mortar.
install (n) drywall, baseboard, and paint along south wall of lower floor family room. excavate exterior planter to replace below grade waterproof membrane. no structural work.
reroofing hot works. will replace skylight like for like. to be pulled under seperate permit. ref 202606163355.
reroof torch down approximately 2,000sf
to obtain final inspection for work approved under pa#202207299571. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
addressing permit only: purpose of this permit is to retire the address 1392 7th ave from apn 1761/022. 198 judah st will be reinstated as the primary address for this property. ref pa #202310118402
reroof no torch. approximately 3,000sf note: address should be 1710 19th ave confirm with ben.
19th floor: interior tenant improvement-new partitions, finishes and lighting, mechanical, electrical are deferred. fire life safety and sprinkler deferred
recommencement and completion of work approved under pa# 201510230679.
revision to 2025121115953, revise foundation detail. change master bath and closet layout at gr floor. no added space. revise rear patio.
verizon: remove (1)(e) antenna & (2)(e) rrvs; install (1) (n) antenna & (1) (n) rrv. no change to (e) batteries
recommencement and completion of work approved under pa# 202409170946
3rd flr: bathroom 2 (n) bathtub and relocate toilet. bathroom 4 remove partition wall, (n) bathtub and relocate toilet. (n) electrical and plumbing as required at area of work only.
unit 505 on 6/f: new bedroom. relocate kitchen. new laundry. new finishes, fixtures at (e) bath. no change to use, area, egress, water or space heating. revision to 202603127484.
3/f unit 5 - interior renovations. new bedroom. new bath. relocate kitchen. new finishes, fixtures at (e) bath. no change to use, area, egress, water or space heating. new laundry. revision to 202603127490, which was otc no plans for kitchen and bathroom remodel.
to obtain final inspection for work approved under pa# 202412025915. all work is complete.
(e) kitchen remodel and add (n) half bathroom
in-kind remodeling of 1 kitchen(s) in 1st fl
28/fl- interior ti to demo and construct non structrual partitions, doors, ceilings, and finishes
revision to # 202506189000: construct 1 new bathroom at g/f (unit 1). remove/replace (e) door to sliding door at 2/f (unit 2). repair (e) front patio, staircase, & deck in-kind less than 50%. replace (e) siding w/ new wood siding. bathroom approximately 40sf. siding approximately 2,400sf.
solar permit: installing 11 solar pv modules, 410 watts per module, total no. of rating 4.51 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | 4.51 kw solar project including a
adding tile mosaic installed on an existing exterior concrete staircase, including an uncoupling & waterproof membrane, the tile mosaics on stair risers, new tread & landingtile, raising three existing area drains to ew surface grade, and adding k tile transition to the existing adjacent sidewalk.
remodel kitchen and 2 bathrooms; remove a wall btw kitchen and living room; replace 2 windows on the 2nd fl bedrooms; install sliding glass door on the 1st fl bedroom recess front wall opening o its original construction condition