PermitDig

Search Permits

7,669 results · type: mechanical

3 ton gas system

5925 Annunciation St, New Orleans
Apr 14

3 ton gas system replacement

2330 Madrid St, New Orleans
Apr 14

2.5 ton gas system

286 Audubon St, New Orleans
Apr 14

meter out over 6 months and water heater

1326 Barracks St, New Orleans
Apr 14

meter out over 6 months and install water heater

1328 Barracks St, New Orleans
Apr 14

Delta gas leak

1854 N Miro St, New Orleans
Apr 14

New Construction with three fixtures: one (1) stove, one (1) water heater, one (1) HVAC unit

2260 N Galvez St Apt 2A, New Orleans
Apr 14

New Construction with three fixtures: one (1) stove, one (1) water heater, one (1) HVAC unit

2260 N Galvez St Apt 1A, New Orleans
Apr 14

gas leak

25 Maryland Dr, New Orleans
Apr 14

Electric water heater installed

2139 Franklin Ave, New Orleans
Apr 14

Replace existing 3.5 ton condenser and evaporator coil

2652 Allen Toussaint Blvd, New Orleans
Apr 14

Replace existing 5 ton condenser, furnace and evap coil

7727 Nelson St, New Orleans
Apr 14

Electric water heater installed

2141 Franklin Ave, New Orleans
Apr 14

Provide 6 month vacancy gas inspection.

2509 Sage St, New Orleans
Apr 14

Six months vacancy gas test,, install tankless water heater

7605 Hampson St, New Orleans
Apr 14

mechanical

7856 DALLAS STREET, Norfolk
0KApr 14

mechanical

7811 NORTH SHORE ROAD, Norfolk
0KApr 14

mechanical

9426 PHILLIP AVENUE, Norfolk
0KApr 14

mechanical

8346 DICKSON DRIVE, Norfolk
0KApr 14

mechanical

5560 BROOKVILLE ROAD, Norfolk
0KApr 14

mechanical

8025 BUFFALO AVENUE, Norfolk
0KApr 14

mechanical

6103 STUDELEY AVENUE, Norfolk
0KApr 14

RESIDENTIAL

3541 BIRCHLEAF DR, Corona
Apr 13

RESIDENTIAL - FAU AND AC CHANGE OUT

1245 LAKEPORT LN, Corona
Apr 13

Install HVAC System 1- 2 ton system, and 1- 2.5 ton system with OXBOX equipment. The rough-in phase involves placing line sets, ducts, vents, and registers to facilitate air circulation and temperature control in each zone. The trim-out phase includes connecting the HVAC units, Installing trim, installing thermostats, and testing the system for proper operation and efficiency.

501 Red Allen Way, New Orleans
Apr 13

Install HVAC System 1- 2.5 ton system with OXBOX equipment. The rough-in phase involves placing line sets, ducts, vents, and registers to facilitate air circulation and temperature control in each zone. The trim-out phase includes connecting the HVAC units, Installing trim, installing thermostats, and testing the system for proper operation and efficiency.

503 Red Allen Way, New Orleans
Apr 13

To install a 3 ton electric system. AIR HADLER, HEAT KIT, AND CONDENSER

4810 Frenchmen St, New Orleans
Apr 13

Install a three ton electric system. Air handler, heat kit and condenser

4804 Frenchmen St, New Orleans
Apr 13

2 1/2 ton air handler and condenser

2401 Feliciana St, New Orleans
Apr 13

Install new 5 ton complete system, including ductwork

5301 E Idlewood Ct, New Orleans
Apr 13