Search Permits
201,887 results
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Minor demolition of the HVAC system on the 5th thru 10th floors as per plans. No change to use, egress or occupancy.
Removal of partitions, doors, ceilings and interior finishes on the ground, 5th thru 10th floors as per plans. No change to use. egress or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Architectural modifications taking place on Cellar, 1st thru 4th floors, Roof as per plans filed herewith. No change in use, egress or occupancy.
INSTALLATION AND USE OF TEMPORARY OVERHEAD, ROOF AND MECHANICAL PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OCCUPANCY UNDER THIS APPLICATION.
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01050571-I1.
Sprinkler Modifications on the 4 & 5th floors as per plans filed herewith. no change in use, egress or occupancy.
Proposed work is an interior renovation of Apt. 7CD, general construction to include new non load-bearing partition walls and reconfiguration of the layout, new finishes, new appliances. (M01403864 filed for removal of partitions and finishes).
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
installation of construction fence under HPD & DOB IED
replace existing roof condensers installed originally under bis appl 01014390 with new condensers and obtain new certificate of opperation. no change to occupancy use or egress.
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - MUJI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Filing to combine apartments 27A and 27B. Remove and install interior partitions, finishes etc. Remove kitchen at apartment 27B. No change in use, egress or occupancy.
Installation of suspended scaffolds for inspection of facades
CHANGE GRADE OF FUEL FROM #2 OIL TO TRUBURN RENEWABLE FUEL OIL.
APPLICATION FILE FOR FACADE REPAIR WORK AS PER PLANS; THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR GENERAL CONSTRUCTION AND MECHANICAL WORK: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN. MECHANICAL WORK FOR AIR EXHAUST SYSTEM FOR NAIL STORE AS PER PLAN. NO CHANGE
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR GENERAL CONSTRUCTION AND MECHANICAL WORK: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN. MECHANICAL WORK FOR AIR EXHAUST SYSTEM FOR NAIL STORE AS PER PLAN. NO CHANGE
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALL NEW COMMERCIAL KITCHEN VENTILATION SYSTEM IN THE 1ST FLOOR OF THE EXIST. 2 STORIES BUILDING. MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF SHALLOW CONCRETE FOUNDATIONS AND ALUMINUM CANOPY STRUCTURE LOCATED ON ACCESSORY OFF-SITE PARKING LOT OF EXISTING BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.