Search Permits
201,887 results
building
building
building
building
building
building
building
building
building
building
building
building
building
Zen townhouses, Unit 1. Fire sprinklers required and will be submitted as an addenda. New electrical meters. The project is master water metered. The site permit is PMT21-02482
Zen townhouses, Unit 1. Fire sprinklers required and will be submitted as an addenda. New electrical meters. The project is master water metered. The site permit is PMT21-02482
Zen townhouses, Unit 1. Fire sprinklers required and will be submitted as an addenda. New electrical meters. The project is master water metered. The site permit is PMT21-02482
Zen townhouses, Unit 1. Fire sprinklers required and will be submitted as an addenda. New electrical meters. The project is master water metered. The site permit is PMT21-02482
COD24-05269 Unpermitted construction for a 413 SF casita and a 288 SF patio cover. Truss calculations deferred. Inspector to field verify adequate fire resistance rated construction and drill & epoxy installation.
New 1832 SF single story residence with a 2 car garage. optional tandem garage with 1701 SF. New meters. Wrap around porches at corner lots
Installation of premanufactured warehouse rack shelving (10ft and 22ft) Class III commodities (approx. 7,302 SF) in an existing 24,157 SF warehouse, type V construction, group S-1 occupancy. Special inspection req. - epoxy/expansion anchors. Results in CoC.
Update plans to the 2018 IRC. New Residential Single story detached 2462 SF with 3 car garage. New water, gas, and electric meter. Post-Tension slab ( Special Inspection). See MST21-06760 for Monteluna. SEE MST21-12324 FOR STRUCTURAL CHANGES AT THE RESERVE AT RED ROCK. SEE MST22-16761 FOR STRUCTURAL CHANGES AT THE GROVE AT LEHI. ADDENDA MST25-06773 GROVE AT LEHI ONLY - CHANGE FROM NATURAL GAS TO PROPANE ON THE PLUMBING SHEET FOR STOVE TOP.
Country Club Apartments Improvement plans for a 56 unit apartment style residential development.
BLANDFORD HOMES #4502 - MONTELUNA New 2597 SF single story residence with 2+ car garage (tandem). Many porch options. new electric, gas and water meters. special inspection for post tension slabs. See MST21-13101 for Reserve at Red Rock. See MST22-16794 AND MST23-14544 for structural changes at the Grove at Lehi. See MST23-09266 for Montelluna. Site specific structural plans for Grove at Lehi subdivision. Product approval Grove at Lehi ADM21-01107. - EV Capable. ADDENDA MST25-06770 GROVE AT LE
Custom Home with attached ADU SFR – New 8852 SF livable area and 7671 SF non livable area. Livable consist of 7914 SF of the main house and 938 SF ADU. Non livable consist of 2138 SF covered areas and 5533 SF garage mechanical and storage areas. New two story custom residence with attached casita including guest master bedroom and living kitchen area - primary master suite with his and hers closets - his and hers offices - great room - formal dining room - kitchen with dirty pantry and day pantr
Remodel – master bathroom shower remodel - remove existing shower - install new shower pan and wall surround - install new plumbing fixtures - install new glass enclosure.
Install one illuminated channel letters halo and face illuminated wall sign AMPED FITNESS 156 sq ft, face replacements on existing monument signs. Signs shall be installed per NEC 2023 with UL listed components.
Install a partial coverage, voluntary NFPA 72 fire alarm system consisting of an existing fire alarm control panel with dialer and annunciator supporting (6) ceiling-mounted horn strobes and (4) pull stations.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Installing a temporary gas powered generator, 600A main feed breaker, for power to a new building. Builder and owner want to get final inspections and CofO for the building while powered by a generator until SRP completes its work. Results in CofC.