Search Permits
201,693 results
Replacement of condenser only 37 PALMA
Replacement of an existing water heater 40-gallon natural water heater change out 12317 Barras Branch Drive Austin TX 78748
Plan: Commercial Expedited Review - [APPROVED] Interior Finish out of Shell Building to Create Restaurant (2162SF).
Replacement of an existing water heater *Shari Curtis: Replace two existing 40-gallon gas water heaters with new Bradford White units adding new expansion tanks and drain pans; no structural change.
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. (5) Applications submitted Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Replacement of an existing water heater 50 gallon natural gas water heater change out 10302 Mourning Dove Circle Austin TX 78750
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. (5) Applications submitted Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Irrigation Installation
Install illuminated M wall sign on East elevation
We will tunnel following the clean out 10 under the slab to expose the broken fitting on the toilet branch line. Once exposed we will make a spot repair on the broken fitting and test the entire system again to confirm there are no additional leaks.
*Partial Demo* Interior remodel
Boone S413 D Left New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Service Rebuild
Ruvee - One set of flush mounted channel lettering & pylon panels refacing.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Level 7 - will include replacement of Pool FF&E upgrades to existing bar finishes reconfigure of existing pool glass railing and replacement of exterior cabanas.
Sheldon S403 C Left New - 2 Story SFR w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
FIFTH THIRD BANK-E03 ILLUMINATED WALL SIGN ON THE SOUTH ELEVATION LOCATED AT 7820 BURNET RD
BLDG 19 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
Install Irrigation System
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 3
Install Irrigation System
261 Square Foot Bathroom Addition to the Rear Bedroom with Shower Tub Separate Toilet Double Vanity Closet and Washer/Dryer.
BLDG 18 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2-CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
New 1-story 4 bedroom 2 bathroom small lot single family residence with attached garage covered front porch and rear covered patio.
Total demo of sfr 908 sqft circa 1954
Install illuminated wall sign reading McDonalds on the South elevation
Replacement of an existing water heater 40-gallon natural gas water heater change out 9208 Beechnut Drive Austin TX 78748
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Level 7 - will include replacement of Pool FF&E upgrades to existing bar finishes reconfigure of existing pool glass railing and replacement of exterior cabanas.
Replacement of complete existing central heat and air system with or without duct work
Total demo of Detached Carport 720 sq ft circa 1985 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***