Search Permits
201,693 results
Replacement of an existing water heater water heater change out 8315 Spring Valley Drive Austin TX 78736
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. Elec: Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications submitted -B201 B202 B103 B104 & A201
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 2
New SFR 2-story home w/3 or 4 bedrooms 2.5 or 3 baths opt gourmet kitchen covered entry patio and 2 car att garage.
New construction single-family residential 1-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A582 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 2 car garage.
Replacement of complete existing central heat and air system with or without duct work replacement of hvac system
Replacement of an existing water heater 40 gallon electric water heater change out
Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
Request electrical Permit for a Temp Pole
Dawson S351 B Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of an existing water heater (2) 40 Gallon Natural Gas Water Heater Replacement
Repair Overhead Riser
Interior finish-out. SP-2022-0071C
Balboa S415 C Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replace Sub Panel
Home builders loop Ref: 2026-075766 BP
Replacement of complete existing central heat and air system with or without duct work change out
Replacement of an existing water heater 50 gallon natural gas tank water heater change out 9550 Savannah Ridge Drive #39 Austin TX 78726
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. (5) Applications submitted Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Replacement of complete existing central heat and air system with or without duct work
This project includes the partial finish out of existing shell space within the B occupancy MOB in order to expand the existing oncology department. The scope includes additional infusion bags exam rooms offices and support spaces
Casita with full bathroom bedroom covered patio and outdoor bath.
Partially enclosing the front porch area to add to the living room remodeling throughout of floors bathrooms closets and kitchen reinsulating the exterior walls and siding replacement. No change to impervious cover
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Gas Vertical
Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
FIFTH THIRD BANK-E01 ILLUMINATED PYLON LOCATED ON THE SOUTH ELEVATION OF THE PROPERTY LOCATED AT 7820 BURNET RD.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect Strangers (restaurant) vestibule and bar services areas.
New single-story SFR (4br/3ba) with attached garage covered patio and covered porch *PRODUCTION BUILDER- GREEN BUILDING*