PermitDig

Search Permits

201,693 results

1000 sf exterior facade painting (scaffolding will be installed). interior leak repair, dry wall (5/8" gyp-x) in-kind 700sf, carpet repair

2611 Divisadero St, Pacific Heights
21KJun 18

18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry.

55 Spear St, Financial District/South Beach
3.3MJun 18

reroof no torch down

8 Kronquist Ct, Noe Valley
14KJun 18

revision to bpa#202504174601. heating & cooling systems changed to 2 outdoor heat pumps with ducted multi-split system. domestic hot water heater revised to be heat pump water heater cf1r, rms-1 doucments updated to reflect these changes.

3500 21st St, Castro/Upper Market
15KJun 18

re-roofing with torch down.

740 Silliman St, Portola
12KJun 18

exploratory demo - remove gypsum board at walls and ceiling of ground floor (300 sq ft total) habitable rooms to expose existing framing to determine how to proceed with design. repair in kind w/ 5/8" type x gypboard w/ 5d cooler nails at 4" o.c. no structural work.

1523 22nd Av, Sunset/Parkside
2KJun 18

reroof torch down

846 Faxon Av, West of Twin Peaks
17KJun 18

reroof no hot works

2739 Taylor St, North Beach
59KJun 18

reroofing: full tear off to install new 2500 sq ft pf comp shingles. no hot works.

2722 Folsom St, Mission
19KJun 18

replace in kind 150 sq ft of tile on floor and walls of bathroom. new waterproofing for shower pan.

1475 Noe St, Noe Valley
12KJun 18

unit 1 remodel kitchen like for like, unit 2 remodel kitchen and bathroom like for like. no conversions. in kind.

823 Divisadero St, Western Addition
28KJun 18

detatched garage back of home: reroofing with hot works.

30 Mclaren Av, Seacliff
7KJun 18

4/f: installation of (7) phone booths x 13sf = 91 sf.

350 California St, Financial District/South Beach
40KJun 18

revision to bpa: 202603137536 - update occupancy load calculations. (7th fl)

114 Sansome St, Financial District/South Beach
0KJun 18

reroof no hot works

7 Scott Al, South of Market
17KJun 18

reroof no hot works

3063 25th St, Mission
40KJun 18

unit# 103: kitchen and bathroom remodel, like for like. new cabinets and countertops , new tile in bathroom. fixtures and appliances. electrical upgrades ad needed. some minor plumbing work. new drywall (5/8" gyp-x) and insulation in kitchen, bathroom and living room.

101 Castro St, Castro/Upper Market
50KJun 18

remodel/repair (e) lower level bathroom in-kind due to dry rot in walls and floor. replace (e) wall/wood surfaces in adjacent room with sheetrock.

1623 34th Av, Sunset/Parkside
30KJun 18

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

134 32nd Av, Seacliff
9KJun 18

to obtain final inspection for work approved under pa# 202505075998. all work is complete.

128 Vicksburg St, Noe Valley
0KJun 18

to comply with nov 202652838: repair fire damage in lobby area. same size same location units 108 & 308:repair 1 window in each unit.

545 Ofarrell St, Tenderloin
15KJun 18

revision to pa# 201611142629, to reflect modified scope of work: minor interior reconfiguration at both levels, eliminate 2nd floor south deck. horizontal addition at rear.

749 27th St, Noe Valley
20KJun 18

renovate existing common areas for mobility accessibility including the community room, laundry room, offices & common restrooms (ada).

35 Lillian St, Bayview Hunters Point
243KJun 18

def mech and elec for 202512172060. mech: selectrive demo and cap of med and low pressure ductwork. new dist for vav boxes. new hot water reheat dist piping, air balance. elec: new power and signal devices throughout space. new 2022 title 24 compliant lighting and controls

450 Sansome St, Chinatown
145KJun 18

as builts created from field mark-ups on permit #2024-0419-0325.

1100 Sacramento St, Nob Hill
185KJun 18

Replacement of complete existing central heat and air system with or without duct work 1 system: 5 Ton Variable Speed Condenser evaporator coil and gas furnace

100 E 51ST ST UNIT 7, AUSTIN
Jun 17

Install Irrigation System

2717 TOWY RD, AUSTIN
Jun 17

SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 1-STORY 4 BEDROOM WITH 3 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO.

4801 BRIDWELL LN, AUSTIN
Jun 17

Replacement of complete existing central heat and air system with or without duct work

3016 GUADALUPE ST BLDG 1 UNIT 317, AUSTIN
Jun 17

ePlan: Commercial Expedited Review - First Time Finish out for Office Space.

3232 E CESAR CHAVEZ ST UNIT 2280, AUSTIN
Jun 17