re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing (w/ torch down)
voluntary strengthening on the ground floor per 2012 sfebc chapter a3. add plywood shear walls and simpson panels with reinforced concrete grade beams
re-roofing, torch down. remove existing roofing system silicone and shingle. inspect & replace any damaged decking. install new shingles and modified bitumin torch down roofing system with new underlayment, replace flashing and seal. no structural changes
to obtain final inspection for work performed under pa#202009234766. all work is complete.
reconfigure hall bath layout, relocate kitchen, add 1 bathroom, wic, laundry room, office on 2nd fl without structural alteration
attic floor -interior renovation of a bathroom on the 3rd flr and exterior window to provide egress to an existing bedroom. windows at 2nd story untouched.
new power and signal devices. deferred under pa# 202606032472
convert ground floor space into living space. 3 bedrooms and 2 bathrooms, laundry room. approx 1243 sqft.
to comply with nov# 202652654: remove and replace approx 2,500 sq ft of sheet rock in kind in various locations throughout the first floor. all work in 1334 natoma. all sheet rock to be 5/8" type x. this is not a permit to remodel kitchens and bathrooms.
to obtain final inspection for work approved under pa# 202408017781. all work is complete.
project consist of ramping the existing entry by 6 inches from the sidewalk to the existing interior finish floor. provide power door operator per da 004 and da 005 for barrier removal.
1/f: install one additional full bathroom, and replace 2 bedrooms' window with 2 new sliding glass doors. 2/f: reconfigure (e) master bathroom to create 2 bathrooms. exterior: replace (e) windows. replace siding with james hardie board on the side and rear elevations only. no front facade work.
1st floor: t.i. including the emo of non-structural partitions and building. new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted separately. (bldg is fully sprinklered)
bathroom remodel, tub to shower
unit c: replacement and installation of new vanity, sink in upstairs bathroom, replacement of existing toilet in upstairs bathroom.
first floor unit: demo kitchen, install new cabinets and counter tops, new electrical plugs, new sink in kitchen. update plumbing and electrical.
rev 202604300396: replace both (e) damaged wooden truss.
re-roofing with torch down. sheething bpa# 202606183553.
remove & replace (e) plywood sheeting with 1/2" c.d.x. plywood with nail@ 10d @ o.c. 10" field@ 6" o.c. edge . roofing under separate permit roof plywood over residential proximate 300 sq.ft. for dryrot work.
to obtain final inspection for work approved under pa# 202406275409. all work is complete.
to obtain final inspection for work approved under pa# 202305177950, 202403117574, 202403147863. all work is complete.
to obtain final inspection for work approved under pa# 202206075750, 202212239072, 202303163795. all work is complete.
revision to 202603137564 2 bathroom remodel. enlarge shower and add tub.
to obtain final inspection for work approved under pa# 201912230360, 202205033486, 202205033490. all work is complete.
to obtain final inspection for work approved under pa# 9322104 all work completed
remove & replace sheetrock inside the building, whole building.
the project is an infill addition of a new powder room and bar at level 2, w/ a new walkable skylight roof. the infill will be in between two (e) walls that extend one story above the roof of the infill. no structural upgrades or seismic retrofit will be required.
revise previously approved pa#: 202011138806 for rear deck railing (existing deck) wood to glass. window and door change. relocate kitchen within 2nd floor
14th fl. tenant improvement work with demo of non-load bearing walls, doors and finishes, new construction of non-structural partitions, demountable partitions, doors, relocated light fixtures and finishes