Install new HVAC system and duct work.
6 month Gas test
Install 3 Ton DAIKIN System (Downstairs) - Install 2 Ton DAIKIN System (Upstairs) - Supply air plenum - Return air plenum - Flex Duct Runs - Run refrigerant lines - Install 2 zone dustless mini split system (1) wall mount air handler garage (1) wall mount air handler pool house and (1) 2 zone condenser (Heat pump)
To install a new gas system for a new tankless water heater, and generator.
-Install 4 Ton DAIKIN FIT variable speed system (1st floor front) - Install 2.5 Ton DAIKIN FIT variable speed system (1st floor rear) - Install 1.5 ton Daikin FIT variable speed system (2nd floor primary suite) - Install 5 ton Daikin FIT variable speed system (2nd floor) - Fabricate plenums and install duct R-8 flexible duct -Run refrigerant lines - Run all necessary low voltage control wiring - Run primary drain lines to plumber provided P-traps - Provide emergency overflow drain pan - Run emer
Installed new gas service from main to generator
New gas line. 2 new water heaters
Install 3 ton HVAC system with 10KW heat strip, copper lines and condenser
Replace existing 3 ton condenser and evap coil
Permit is for the replacement of the current gas system with a new 5 ton gas system. System includes furnace, evaporator coil and condenser. Also includes adding new ductwork to some areas.
install hvac system for project - contract value is hvac and plumbing - roof 294 outdoor units
install hvac system for project - contract value is hvac and plumbing - 5th floor units 501-559 - 59 indoor units
install complete hvac system - contract includes entire project, hvac and plumbing - no apartments on first floor - 7 indoor units
install complete hvac system - contract is entire project, hvac and plumbing - 2nd floor unites 201-204, 206-259 - 58 indoor units
install hvac system for project - contract amount is entire project, hvac and plumbing, 3rd floor units 301-359, 59 indoor units
install hvac system for entire project - contract value is hvac and plumbing - 4th floor units 401-459, 59 indoor units
install hvac system for project - contract value is hvac and plumbing - 6th floor units 601-659 - 59 indoor units
remove & replace (1) 3 ton condenser
remove & replace (1) 2 ton condenser
Replace existing 4 ton condenser and air handler
Entergy Leak. Meter reset
Install 4 Ton HISENSE Variable Speed Heatpump System (Downstairs) - Install 2 Ton HISENSE Variable Speed Heatpump System (Upstairs) - Supply air plenum - Return air plenum - Flex duct runs - Run refrigerant lines - Run drain line to P-Trap - Safety switch for main drain line and emergency pan