PermitDig

Search Permits

11,987 results · type: mechanical

CH/IS217X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (CHUTE)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB#X01108281, NO CHANGE IN USE, OCCUPANCY OR EGRESS

977 FOX STREET, Bronx
20KJun 23

Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.

510 MADISON AVENUE, Manhattan
785KJun 23

MECHANICAL WORK AT ROOF TO ADDRESS FDNY VIOLATION NO. 014252480P. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

220-10 HILLSIDE AVENUE, Queens
30KJun 23

Mechanical work type hereby filed subsequent to the NB GC application: Q01297223-I1

3217 FAR ROCKAWAY BOULEVARD, Queens
Jun 23

INSTALLATION OF SUPPLEMENTAL SPLIT-SYSTEM HEAT PUMPS FOR HEATING AND COOLING OF THE BUILDING ASSOCIATED WITH THE NB ALERATION FILING.

1507 EAST 52 STREET, Brooklyn
25KJun 23

Renovation of the 2nd-floor mechanical room, as well as the 3rd-floor setback roof portion where the mechanical equipment is located, is associated with the Mechanical scope. No change is use, egress, or occupancy under this application.

56 EAST 68 STREET, Manhattan
250KJun 23

INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

885 MYRTLE AVENUE, Brooklyn
6KJun 23

MINOR INTERIOR WORK TO RENOVATE EX TOILETS AND KITCHEN BY REPLACING PLUMBING FIXTURES AND INSTALLING NEW WALL, FLOOR AND CEILING FINISHES. WORK WILL INCLUDE INSTALLATION OF WALL MOUNTED EXHAUST FAN. NO CHANGE TO THE USE, OCCUPANCY OR EGRESS

43-31 39 STREET, Queens
131KJun 23

MECHANICAL MODIFICATIONS TAKING PLACE ON 1ST FL & MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

1372 BROADWAY, Manhattan
6KJun 23

HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT, INCLUDING COMMERCIAL KITCHEN RANGEHOOD VENTILATION SYSTEM IN CONJUNCTION WITH TENANT IMPROVEMENT NO CHANGE TO USE OCCUPANCY OR EGRESS. Chipotle; space 0176

5100 KINGS PLAZA, Brooklyn
80KJun 23

REMOVAL AND RELOCATION OF EXISTING MECHANICAL DUCTWORK AND ADDITION OF NEW EXHAUST DUCT AND REGISTERS.

307 WEST BROADWAY, Manhattan
98KJun 23

Filing herewith mechanical/hvac sope for elevators lobbies at 7th thru 11th floor as per plans. No change in use, occupancy, or egress under this application.

375 MADISON AVENUE, Manhattan
104KJun 23

Mechanical work for Suite 300 @ Pier 62

111A 11 AVENUE, Manhattan
60KJun 23

REPLACMENT OF TWO WATER SOURCE HEAT PUMP UNITS WITH A TOTAL CAPACITY OF 30 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.

1396 2 AVENUE, Manhattan
105KJun 23

MECHANICAL WORK TAKING PLACE ON THE 25TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

60 EAST 42 STREET, Manhattan
4KJun 23

INSTALL CHIMNEY LINER AND CONDENSATE TANK AS PER PLANS.NO CHANGE TO USE, OCCUPANCY OR EGRESS.

94-02 60 AVENUE, Queens
60KJun 23

Mechanical system consisting of heating, ventilation and air conditioning in conjunction with job X01387098-I1.

1 FORDHAM PLAZA, Bronx
35KJun 23

Herewith Filing Modification to existing Mechanical system in conjunction with interior renovations of offices. No change in Use, Egress or Occupancy is proposed under this application. Work at 12th Floor Construction/ 16th Floor Marketing

110 EAST 42 STREET, Manhattan
305KJun 23

DIRECT REPLACEMENT OF ROOF TOP UNITS

1847 ROCKAWAY PARKWAY, Brooklyn
21KJun 23

Mechanical demolition on 33rd floor as per plans. No change to use, egress or occupancy.

10 EAST 40 STREET, Manhattan
66KJun 23

MECHANICAL WORK AS PER PLANS FILED HEREWITH.

175 DELANCEY STREET, Manhattan
Jun 23

AC UNITS TO BE REFURBISHED & REBUILT.HUMIDIFIERS TO BE REMOVED & REPLACED ON THE 5TH FL.GAS BOILER AND ASSOCIATED PIPING TO BE REMOVED. PIPING AND ELECTRIC BOILER TO BE RECONNECTED.BASE BUILDING HOT WATER PUMPS TO BE ADDED WITH ALL NECESSARY PIPING SUBCEL

1048 5 AVENUE, Manhattan
500KJun 23

Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: modify Mechanical systems to conform with new layouts for new hospital program, as per plans filed herewith.

269-11 76 AVENUE, Queens
1.5MJun 23

PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING ALONG WITH INTERIOR RENOVATION.

110-40 70 AVENUE, Queens
2.0MJun 23

Installation of split system cooling and supplemental heating.

17 WEST 10 STREET, Manhattan
45KJun 23

Modifications to the existing HVAC System: Installation of new supplemental AC Unit, ductwork, controls on the 28th Floor as per plans (Dechert LLP - Supplemental AC Unit.) No change to use, egress or occupancy.

1095 SIXTH AVENUE, Manhattan
230KJun 23

Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.

264-25 76 AVENUE, Queens
Jun 23

Replacement AC and Ventilation Units with Associated Piping, installation of a new tempered heat pump. No change in egress, use, zoning or occupancy.

250 EAST 61 STREET, Manhattan
318KJun 23

DIRECT REPLACEMENT OF SPLIT AIR CONDITIONING SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

1726 KINGS HIGHWAY, Brooklyn
96KJun 23

MECHANICAL SYSTEMS MODIFICATION ON THE 11th FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

286 MADISON AVENUE, Manhattan
110KJun 23