Search Permits
201,659 results
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. IF EQUIPEMENT IS MOUNTED TO AN H-FRAME, THE H-FRAME SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFI
Place new concrete at base of existing loading dock to raise level. Demo stairs and bollards at loading dock and replace with new. Approved as noted. Results in CoC.
New 2309 SF single story residence with a 2+ car garage at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs **SEE ADDENDA MST25-07605**
Install drone related equipment on rooftop of an existing building. Connect drone related equipment to existing electrical panel. New structural and electrical. Results in CofC.
Onsite and Offsite Improvements for Haven at Hawes. Includes (2) 1" Landscape Meters with 1" services and BFP.
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
New ground up 285,282 SF unlimited area data hall building with type II-B construction. Group B occupancy classification. Project includes the installation of mechanical and electrical yards. Foundation under PMT25-22348. Reference: PMT26-07321 for restroom code modifications, PMT26-07319 for fire access code modification and PMT26-07315 for fire sprinklers. Deferred fire sprinklers, fire alarm with emergency voice/alarm AND VESDA systems, cold form steel, pipe support systems, prefabricated bui
Converting tub to shower. Replacing pan, drain, and valves.
Remove and replace (3) 20ft high x 40ft wide Batters eyes at existing baseball fields. Replace existing batters eyes with 6 5/8-inch post and 9g chain link fabric. Special inspection required for steel and concrete. Results in CoC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
REPLACING A IMPROPERLY INSTALLED/MANIPULATED BACKFLOW DEVISE SER#2516275 FOR THE IRRIGATION.
NEW 1970 SF SINGLE STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. ADDENDA MST22-18751 - PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION: · REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F.
New Addition and Remodel – New 132 SF livable master bathroom addition - remodel 325 SF of existing master bathroom. Type V construction. R5 occupancy. No deferred items. Special inspections required for epoxy installed reinforcing bars.
New 2406 SF single story residence with a 2 car garage at AVALON CROSSING. Includes a new water, electric and gas meter. Includes an option of a tandem garage
TAYLOR MORRISON #3517 - New 1832 SF single story residence with a 2 car garage and a 2+ car garage option. Built at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs. See MST23-15066 for parcel a,b,d,e of Hawes crossing. Addenda MST25-01482 Add Parcel H & F information: Revised parcel A, D, B & E information. Square footages updated for both MST23-15066 & MST25-01482.
Demolish and remove existing fiberglass tub/shower combo: install a low-profile preformed shower base, DenShield backer, Durabath shower wall panels.
Installation of 2- inch Water Service Line and 2-inch Water Meter City Services Outside City Limits at 8345 E Odessa St, APN:219-23-022L Reference PMT23-13928 for the Utility Service Agreement and paid Water Meter.
Repair wood framed wall from car impact. This report identifies permits and documentation required to obtain a permit for removal or restoration of the building to a safe condition. This report is not an appraisal for financial claims. The building inspector may require portions of the building or other debris to be removed to allow evaluation of the damage. Structural shoring and additional lighting may also be required. Before demolition or restoration can begin, an approved method of tra
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
CONSTRUCT A 212 SF SWIMMING POOL NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
New 2185 SF single story residence with a 2 car garage at Avalon Crossing. New water, gas and electrical meters. Special inspection for post tension slabs
Retro Permit application for the following: 1) Installation of Navien Tankless Hot Water Heater (to replace old 50 gallon hot water heater / electrical outlet for Tankless Hot Water Heater. 2) Installation of additional pipe to water softener loop for 20 inch Big Blue home water filter and softener tanks, 1/4 turn flush valve kit. 3) Installation of Pressure Reducing Valve (PRV) to main water line.
building
building
building
building
building
building
building
building