Search Permits
201,659 results
Addition and/or Alteration
Alterations
Alterations
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Change of Use
Fire damage repair in unit at existing multi-family building subject to field inspection (STFI)
Remove and dispose of the existing roofing system. Remove and replace twenty-one (21) roof sheathing panels as required to provide a structurally sound substrate for installation of the new roofing system. Install new vapor barrier batt insulation 6.6" PolyISO insulation to achieve R-38 1/2" DensDeck cover board and a new mechanically attached 60-mil MuleHide TPO roofing system. Replace the existing through-wall scupper and install new metal coping to complete the roofing assembly.
Construct alterations to basement of one family dwelling per plan. Includes voluntary seismic retrofit per Earthquake Home Retrofit plans.
Construct alterations and new exterior stairs for existing one family dwelling per STFI.
Demolish one-family dwelling & detached accessory structure subject to field inspection (STFI)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Demolition of an existing metal warehouse structure approximately 2499 square feet originally constructed circa 1955. 2026 022559 DA - Approved
Express: Tub to tub replacement in the same location (like for like)
New Service for SFR in ETJ
Reroof replacing like for like asphalt shingles.
Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be two access holds in front of and behind the house.
Repair plumbing underneath bathroom after tunnel is dug to expose the plumbing pipes underneath the home.
Irrigation
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
Interior Non Structural Demolition
7 DAY - Electrical: adding power for 3 ovens + 3 hoods New main gas line + 3 supply lines Replacement of Complete duct system only Adding intake/exhaust duct for (3) ovens along with (6) new fans AT EXISTING BUSINESS - OVA
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
Proposed 640 sq ft Pre Fab building that is state approved with electrical service to the bathroom. Site Plan reference SP-2025-0254C (Restroom)
Minor interior remodel for existing Medical Office.
Replacement of complete existing central heat and air system with or without duct work