Search Permits
200,795 results
building
building
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
building
building
building
building
building
building
building
building
building
building
18 lot single family subdivision on 3 acres of vacant land. The project includes widening of Signal Butte Road - Old permit # (BLD2016-07128) New 16x16 ramada, site walls, theme walls site electrical.
ADMINISTRATIVE USE PERMIT PER SEC.11-70-3 OF THE ZONING ORDINANCE FOR A TEMPORARY SALES OFFICE AND MODEL HOME COMPLEX WITHIN A RESIDENTIAL ZONING DISTRICT FOR HOMES BEING CONSTRUCTED IN THE IMMEDIATE SUBDIVISION, SUBJECT TO THE SITE PLAN APPROVED WITH THIS PERMIT. APPROVAL OF THE SALES OFFICE AND MODEL HOMES MAY BE GRANTED FOR A 3 YEAR PERIOD, OR UNTIL ALL HOMES IN THE SUBDIVISION ARE COMPLETED, WHICHEVER OCCURS FIRST. ORD. 873 ALLOWS EXTENSION IF NEED IS SHOWN. GARAGE AREA MODIFIED OR IMPROVE
NEWMARK HOMES #30-1003-1675 - NEW 1669 SF 2 STORY RESIDENCE WITH A 2 CAR GARAGE IN DIAMOND COURT. NEW WATER, ELECTRIC AND GAS METERS. SPECIAL INSPECTION REQUIRED FOR POST TENSION SLABS. SEE MST22-08616 FOR POST TENSION SLAB CHANGES. AZ WATER
THIS IS A USE PERMIT FOR A TEMPORARY CONSTRUCTION FIELD OFFICE FOR USE BY CONTRACTORS WHILE A PERMANENT BUILDING IS UNDER CONSTRUCTION. THE CONSTRUCTION TRAILER MUST BE PLACED ONLY ON THE PROPERTY THAT IS BEING DEVELOPED AND OUT OF ALL BUILDING SETBACKS. NO PUBLIC USE IS PERMITTED. THIS USE PERMIT SHALL BE NON-TRANSFERABLE FROM ONE OWNER OR LESSEE TO ANOTHER AND SHALL EXPIRE ON DECEMBER 31, OF EACH YEAR UNLESS EARLIER REVOKED. ESTIMATED TIME OF CONSTRUCTION TRAILER REMOVAL **09/15/2024**. GENER
To provide temporary power to construction site. New temporary single phase electric meter.
THIS IS A USE PERMIT FOR A TEMPORARY CONSTRUCTION TRAILER FOR USE BY THE PROJECT MANAGER, PROJECT COORDINATOR AND LEAD BUILDERS. THE CONSTRUCTION TRAILER MUST BE PLACED ONLY ON THE PROPERTY THAT IS BEING DEVELOPED AND OUT OF ALL BUILDING SETBACKS. NO PUBLIC USE IS PERMITTED. THIS USE PERMIT SHALL BE NON-TRANSFERABLE FROM ONE OWNER OR LESSEE TO ANOTHER AND SHALL EXPIRE ON DECEMBER 31, OF EACH YEAR UNLESS EARLIER REVOKED. ESTIMATED TIME OF CONSTRUCTION TRAILER REMOVAL 4/9/2024. PERMIT INCLUDES GE
Install above ground buildings and structures associated with Phase 02. Foundations and underground utilities for Phase 02 have previously been permitted under PMT24-07723. Other exclusions to this permit review include all pre-engineered metal buildings (PEMBs) located on the phase 02 site. These structures will be permitted through the Arizona Department of Housing (ADOH) and provided to the City of Mesa for fire code review as part of that submittal. Deferred fire sprinklers, fire alarms and