Search Permits
200,795 results
Rigging for Industrial Rope Access
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
PROPOSED TO CUT, CAP AND DEMOLISH SPRINKLER SYSTEM IN CONJUNCTION WITH FULL DEMO JOB # B01332467. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Temporary construction fence
INTERIOR RENOVATION OF AN EXISTING APARMTNET #6U ON 6TH FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
FILING FOR INTERIOR RENOVATION OF THE 33RD FLOOR POLAR OFFICE AS PER PLANS SUBMITTED HEREWITH.
INTERIOR RENOVATION OF APARTMENT # 3 AS PER THE ARCHITECT'S DRAWINGS, INCLUDING NON-STRUCTURAL PARTITION MODIFICATIONS, DOOR REPLACEMENTS, FLOORING, CEILINGS, MILLWORK, FINISHES, AND RELATED COSMETIC UPDATES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
RENOVATION OF EXISTING CELLAR WITH PLUMBING WORK: NEW 2-PC RESTROOM IN CELLAR AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
A COMMERCIAL SPACE WITH MECHANICAL WORK ON THE FIRST FLOOR.THIS APPLICATION IS RELATED TO DOB ALT 2 JOB#M01407822-I1.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Sprinkler and Standpipe system filed in conjunction with residential conversion.
Interior renovation of 2-bedroom apartment including minor non-structural partition demolition, new partitions, new flooring. No change to use, egress or occupancy.
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS.
Plumbing work in conjunction with job #B01393482-I1. To remedy ECB violation #35484186Z. No change in use, occupancy or egress.
RENOVATION AND COSMETIC UPGRADE OF THE EXISTING STOREFRONT FACADE OF AN EXISTING COMMERCIAL RETAIL SPACE.
AN EXISTIGN COMMERCIAL SPACE WITH PLUMBING WORK ON 1ST FLOOR ONLY.THIS APPLICATION IS RELATED TO ALT 2 JOB#M01407822-I1.NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
APPLICATION FILED TO OBTAIN CERTIFICATE OF COMPLIANCE FOR HVAC UNITS INSTALLED UNDER JOB #320391278
Modifications to the existing plumbing system on the 20th floor (NYC Campaign Finance Board) as per plans. No change to use, egress or occupancy.
REPLACEMENT OF COOLING TOWER ON THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; REPLACE 2-PC RESTROOM, NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FILING HEREWITH DRAWINGS TO PROPOSE AN INTERIOR RENOVATION OF EXISTING APARTMENT # 6A. THIS APPLICATION DO NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EXISTS OR OCCUPANCY.
MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
ARCHITECTURAL WORK ON 1ST AND 4TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.
Installation of solar panels, rooftop, grid tied, railed, 13 modules, 5.655 KW
INTERIOR RENOVATION OF EXISTING APARTMENT INCLUDING REMOVAL OF NON-LOAD BEARING PARTITION AND FINISH CHANGE. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Facade repair to include cutting & pointing of joints, replacement of brick masonry and window sills, stone patching & repair as per plans.
Remove, relocate and replace plumbing fixtures and add new fixtures.
Modifications and additions of plumbing fixtures and piping on the BNY Facade as per plans. No change to use, egress, of occupancy.
Installation of new drinking fountain relocate existing electrical water heater, replace new water closet and sink disconnect gas piping to existing mechanical unit, no change in use, occupancy or egress under this application