Search Permits
200,593 results
Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [4bed 5bath] Work to include addition of second unit on second floor first floor addition new beds new baths [1bed 2.5bath] and garage increase.
service upgrade
Randall 3314 C Right New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.34 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 30-9 Actual Bld height: 30-9 required parking: 2.
Irrigation Installation
Whole house gas tested to ensure all gas lines are good
Installing new sewer system and connecting to the city tap
ETJ new service for SFR
Install a new 60-amp circuit in the 200-amp main panel and wiring directly behind the panel to the right side of the interior garage wall. Hardwire the Emporia classic J1772 and configure to draw up to 48AM continuous.
Install Sprinkler System
New Irrigation Installation
Adding a 1inch gas feed to supply a generator for the home
ATT Proposes to co-locate Tower work includes antennas RRUs Surge suppressors fiber trunk cables. DC Power trunk cables. Ground wooden fence extension installation of concrete pad raised steel platform ice bridge equipment fire extinguisher cabinet 200a Meter and Breaker 1 20kW 48V DC Diesel Generator H-Frame with Batteries
CareNow Manor Sign B
Replace interior hot and cold water lines with Uponor PEx pipe.
Install Level 2 EV Charger
Galloway 3312 A Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.62 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
New construction 2-Unit use single-family residential 2-story 4 bedroom 3.5 bath with attached 2-car garage and uncovered wood rear deck.
Auxillary water supply from well
EXPRESS: Tub to shower conversion install a 12 ft long concrete ramp with hand rails
New inground pool
Homebuilders loop for New SFR ref 2026-053064 BP. Austin LTD -PEC
Excavate 30 tunnel to repair the main drain line under the house.
Replacement of an existing water heater Direct swap of the existing tankless on the outside wall for a comparable sized Navien tankless (standard-sized units). Bypass tee for NPE-A2 models is not included. Thermal expansion tank new catch pan and other necessary code
Express: Tub and valve replacement
Express: Foundation repair - installing steel piers and Hybrid Piers
Express: Foundation repair
Sideline Sports Bar Sign C East elevtion
Brahman 3318 A Right New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 687.60 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 28-10 Actual Bld height: 28-10 required parking: 2.
Replacement of complete existing central heat and air system with or without duct work
7 DAY - INTERIOR REMODEL PHASE 1 CREATING UNIT 350 DEMISING WALL BREAKROOM SAF OFFICE SPACE - OVA