Search Permits
200,337 results
New construction of 2 story sfr condo with 3 beds 2.5 baths and attached 2 car garage PUD
Backup generator installation
Install Level 2 EV Charger
30 tunnel below the foundation to repair the master bath and utility drain lines. 2 access holes - left right
Install shade structure at Boone ES. AISD Project.
The request is for the removal/replacement and disconnect/reconnect of electrical service ( same meter no ESPA) due to the siding replacement in building 10
Express: Tub to shower conversion in hall bath Demo and replace rear walkway to remove trip hazards install short CIP concrete ramp with one railing and correct slope.
Adaptive reuse of existing historic bar into residential accessory structure. Addition & remodel to existing legal non complying structure to include new elevator new stair and reconfiguration of the floorplan layout on all levels.
ePlan: Residential Expedited Review - New TWO UNIT RES. Bldg 1 New construction of a 2-Story Single Family Res. [4bed 4.5bath]
New construction of 2 story SFR 4 beds 2.5 baths covered patio porch opt gourmet kitchen opt fireplace opt study opt ext covered patio and 22.5 3 car garage PUD
Replacement of complete existing central heat and air system with or without duct work HVAC Changeout/Alteration: Replace and install 2 Ton Air Conditioner and gas furnace; like-for-like unit; no structural change.
Irrigation Installation
Total demo of a SFR 1212 sq ft built 1950 (total demo of pool 130.11 and total demo of storage 96 sq ft) ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Install 100 amp. overhead temporary power pole at 4205 Ramsey Avenue
Express: foundation repair
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3.5 Ton AC System
Electrical service to water quality pond ref: 1984 000197 - Subdivision plan for pond This will be to power a panel that tracks the storm water in the pond and opens a valve to let the water out when it is too high.
New Construction in the ETJ SFR
Disconnect and Reconnect Only - ETJ Installation of a 200A Service-Rated Automatic Transfer Switch 22kW whole home generator additional grounding and type 2 surge protection
45 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - back back front
Replacement of complete existing central heat and air system with or without duct work 3 ton straight cool system
CareNow Parmer Sign A1
Express: fire/vehicle damage non-structural exploratory demo
Construct new driveway approach of 17 FT and sidewalk of 30 LF
Replacement of an existing water heater
New Construction- 2 story 4 bed 3.5 bath covered porch and patio attached two-car garage. PUD
Irrigation Installation
Replacement of complete existing central heat and air system with or without duct work
homebuilder loop refer to 2026 - 066293 BP
pull and replace water heater like for like