Search Permits
200,337 results
100amp subpanel replacement install surge protection. No meter work is being performed. Service Provider: Austin Energy
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton AC System
QT - Minor renovation work to Live/Work Condo Unit (first owner) to update to lighting reconfigure small closet and minor demolition and framing work. At existing residence - OVA
Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <5 feet New 34 EMT conduit to power the Level 2 EV Charger at 48amp constant draw.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 1.5 Ton AC System
Express- Tub to shower replacement (prefab base) in the same location
Construct new driveway approach of 17 FT and sidewalk of 28 LF
New irrigation Installation
excavation of an access area at the front of the home along with tunneling approximately 28 feet beneath the porch and home to expose the damaged kitchen drain sewer line.
irrigation install
Replacement of complete existing central heat and air system with or without duct work
add plug and lite
Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [4bed 5bath] Work to include addition of second unit on second floor first floor addition new beds new baths [1bed 2.5bath] and garage increase.
service upgrade
Randall 3314 C Right New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.34 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 30-9 Actual Bld height: 30-9 required parking: 2.
Irrigation Installation
Whole house gas tested to ensure all gas lines are good
Installing new sewer system and connecting to the city tap
ETJ new service for SFR
Install a new 60-amp circuit in the 200-amp main panel and wiring directly behind the panel to the right side of the interior garage wall. Hardwire the Emporia classic J1772 and configure to draw up to 48AM continuous.
Install Sprinkler System
New Irrigation Installation
Adding a 1inch gas feed to supply a generator for the home
ATT Proposes to co-locate Tower work includes antennas RRUs Surge suppressors fiber trunk cables. DC Power trunk cables. Ground wooden fence extension installation of concrete pad raised steel platform ice bridge equipment fire extinguisher cabinet 200a Meter and Breaker 1 20kW 48V DC Diesel Generator H-Frame with Batteries
CareNow Manor Sign B
Replace interior hot and cold water lines with Uponor PEx pipe.
Install Level 2 EV Charger
Galloway 3312 A Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.62 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
New construction 2-Unit use single-family residential 2-story 4 bedroom 3.5 bath with attached 2-car garage and uncovered wood rear deck.
Auxillary water supply from well