Search Permits
11,965 results · type: mechanical
MECHANICAL DUCTWORK ONLY ASSOCIATED WITH INTERIOR TENANT-FIT-OUT 6TH FLOOR OFFICE RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
LEGALIZE EXG MH, PER PLANS UNDER 1968 CODE AT EXG 2-FAM BLDG. REPLACES EXPIRED MH WORK UNDER JOB 302057379 FILING. (NOTE, RELATED PLUMBING WORK TYPE UNDER PRIOR JOB 302057379 WAS SIGNED OFF SEPARATELY). NO CHANGE OF USE/OCCUPANCY OR EGRESS UNDER THIS AP.
subsequent application filed for use of Mechanical means for demolition.
SUBSEQUENT FILING FOR MECHANICAL WORK ON 4TH FLOOR (UNIT#3). NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Installation of a new non-emergency gas generator, access hatch grab bar, grab bar railings, and high railing enclosure with gate on the roof. No change in use, egress, or occupancy.
Hereby filing to to install and modify ductwork and piping for showroom renovation as shown on plans filed herewith. No change to use, occupancy or egress.
INSTALLTION OF SPLIT UNIT AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
CSC STORE #24487 BUILDOUT OF EXISTING EATING AND DRINKING ESTABLISHMENT RESTAURANT, INCLUDING INSTALLATION OF CEILINGS, MILLWORK AND EQUIPMENT. WORK WILL ALSO INCLUDE CONSTRUCTION OF BULKHEAD. THIS APPLICATION TO SUPERSEDE 420968956. CHANGE IN USE OCC EGR
PROPOSED MECHANICAL PLANS FILED HEREWITH.
Mechanical work as per plans filed.
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
New Construction
Addition and/or Alterations
New Construction
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Replacement of complete existing central heat and air system with or without duct work Replace the central HVAC system.
Addition and/or Alterations
ePlan: Expedited Review - New Construction of a 4-Story Multi-Family Bldg. with Private Parking Garage - Fire Area A (30688 SF).
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 531
ePlan: Expedited Review - New Construction of a 4-Story Multi-Family Bldg. with Private Parking Garage. - Fire Area A (30688 SF)
ePlan: Expedited Review - New Construction of a 4-Story Multi-Family Bldg. with Private Parking Garage - Fire Area B (40595 SF).
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 1-STORY 3 BEDROOM WITH 2 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO
Express: replacing windows and doors like for like and replacing whole roof and install gutter and exterior breaker box replacement and replacing kitchen cabinets and retile bathroom and replacing HVAC condenser. Replace the floor vinyl
Interior remodel only. Some sprinklers to be relocated.