Search Permits
11,965 results · type: mechanical
HVAC DUCT MODIFICATIONS FOR GROUND FLOOR MEETING ROOMS AS PER PLANS FILED HEREWITH.
INSTALL NEW CHIMNEY LINER & CONNECT TO EXISTING OFFSET AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
FILING TO INSTALL KITCHEN HOOD AND DUCTWORK AS PER PLANS FOR THE HALAL SPOT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN, USE, EGRESS, OR OCCUPANCY.
EQUIPMENT USE: DUAL 6559 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
MECHANICAL SYSTEMS WORK ON THE 37TH MARKETING FLOOR (36TH CONSTRUCTION FLOOR) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE CONCRETE STAIR AT OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Mechanical work as shown on plans filed herewith.
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE CONCRETE STAIR AT OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Modifications to the existing HVAC system on the 34th Floor (MTS Health) as per plans. No change to use, egress, or occupancy.
Installation of water cooled packaged air conditioning units, fan and related ductwork/piping as per plans filed herewith. No change in use, egress or occupancy under this application.
MH WORK FOR OFFICE BUILD OUT ON THE 25TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Mechanical modifications on floors 8 and Roof (including Clerestory and Bulkhead) as per plans filed herewith. No changes in use, egress or occupancy.
INSTALLION AND USE OF TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION IS FILED FOR THE DEVELOPEMENT OF 3-STORY, 2-FAMILY ATTACHED RESIDENTIAL BUILDING.BUILDING LOCATED ON (1) OF SIX TAX LOTS ON (1) ZONING. ALL WOK AS PER PLANS SUBMITTED HEREWITH.
Mechanical modifications taking place on the 17th floor (21st floor Marketing) as indicated on the drawings.
PROPOSED TWO-FAMILY DWELLING WITH ACCESSORY BUILT-IN TWO CAR GARAGE.
REFILING HEREWITH APPLICATION FOR MECHANICAL WORKTYPE. APPROVEDED UNDER JOB # X00705133 EXPIRED BY TIME LIMITATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION IN AN EXIST: RETRAIL STORE FOOD MARKET: NON- BEARING MINOR PORTITIONS, REFREGERATION EQUIPMENTS, COOOKING EQUPMENTS, 8FT SS HOOD, EXHUST FAN AND REPEAR THE FLOOR AS PER PLANS. NOCHANE OF USE EGRESS OR OCCUPANCY
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
REPLACMENT OF SPLIT SYSTEM ON THE GROUND FLOOR AND OUTSIDE SPACE WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
APPLICATION IS FILED FOR THE CONSTRUCTION OF (1) SEMI-ATTACHED 2-FAMILY 3-STORY RESIDENTIAL BUILDING WITH CELLAR WITHIN A NEW (6) UNIT DEVELOPMENT. ALL WORK AS PER PLANS SUBMITTED HEREWITH
Modification to Mechanical systems as per plans filed herewith.
REPLACEMENT OF EXISTING FAN COIL UNITS AND ASSOCIATED PIPING AND ACCESSORIES, INSTALLATION OF SUPPLY DUCT WORK, TOILET EXHAUST AND GENERAL EXHAUST. NO CHANGE IN EGRESS OR OCCUPANCY.
Mechanical equipment use for interior partial demolition filed separately under M01289549-I1.
The William Alanson White Institute limited Mechanical systems, restroom exhaust work in conjunction with interior general construction renovations at 4th & 5th floors as per plan filed herewith. No change to use, egress or occupancy under this app.
INSTALL 9 CONDENSER UNITS ON EXT. WALLS & 28 DUCTLESS AIR-HANDLER UNITS AT INTERIOR OF FACILITY INCLUDING REFIGERANT PIPING AND AUXILIARY SYSTEMS AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.